Estimating
Build the estimate: takeoff lines, waste, profit, labor and every cost on top. 24 step-by-step guides, each with a narrated video walkthrough, real screenshots from a filled-in sample job and the numbers worked through.
- Guide 7
Your first estimate, step by stepFrom a blank Estimate Quote to a checked, emailed PDF, using a real retail shell bid.
- Guide 8
Project header and job infoProject, GC, dates, sections and the Yes / No selectors that print on every proposal.
- Guide 9
Takeoff lines and sub-linesEvery column of the takeoff grid, ↳ sub-lines, multi-row edits, zoom and freeze.
- Guide 10
Installer labor pay on net areasPay labor on what is installed, buy material on what is carried to the site.
- Guide 11
Waste and attic stockAttic % turns the takeoff Qty into the Mat’l Qty you buy, order and price.
- Guide 12
Markup or marginOne switch decides how GP turns cost into price. See what it does to a $170k bid.
- Guide 13
Freight, tax, bond and burdenFreight per unit on each line; tax, bond, contingency and burden on the proposal price.
- Guide 14
Subcontractors and additional costsSub quotes with their own profit %, sub approval, and disposal, travel and test fees.
- Guide 15
Import a Callidus Summary ReportDrop the PDF in, review the typed lines and checks, and transfer them to the Estimate Quote.
- Guide 16
Import an Excel or CSV takeoffMatch the columns once, check the preview, transfer the lines and save the format for next time.
- Guide 17
Carpet tile and broadloomSquare yards, spec attic stock, stair nosing sub-lines, adhesive and man days for carpet.
- Guide 18
LVT, LVP and VCTColors as sub-lines, attic stock, adhesive by the pail, and crew days for LVT and VCT.
- Guide 19
Sheet vinyl, flash cove and rubberFlash cove, cove stick, cap, seam welding and corners as sub-lines; rubber sheet and tile.
- Guide 20
Wall base and transitionsRubber base, tile base and transitions in linear feet, with grout sub-lines and crew days.
- Guide 21
Change orders and alternatesOwn sheet, own ID and status for each one, rolled into the total with COs.
- Guide 22
Man days from installation ratesPick a labor item per line; Mat’l Qty ÷ daily production gives the crew days.
- Guide 23
Labor rates and overtimeLoaded hourly rates, overtime and prevailing wage, and the man days your labor price pays for.
- Guide 24
Sales commissionTier incentive, point for point, job total, gross profit and shop cut, side by side.
- Guide 25
Travel and subsistenceDrive time past the free zone, mileage, hotel and per diem, worked out from the crew plan.
- Guide 43
Import Measure Square 8Open the Summary report PDF, check the lines, transfer them to the estimate.
- Guide 44
Import RFMS MeasureOpen the RFMS takeoff report PDF, check the lines, transfer them to the estimate.
- Guide 45
Import FloorRightOpen the Job Summary PDF, check the lines, transfer them to the estimate.
- Guide 52
Import Rules for clean importsWords, codes, sub-lines and program rules, so each takeoff line lands on the right type.
- Guide 53
Sample templatesThree ready estimate quotes to copy, from a small tenant improvement to a full building addition.
Follow along in your own copy
The 30-day free trial unlocks every feature in these guides. No credit card, Windows 64-bit.