CFE guide · Estimating
Import a FloorRight Takeoff Into Your Estimate
Save the Job Summary from FloorRight as a PDF and open it in Import Takeoff. CFE BidWise reads each line with the multiplied quantity and net material area, brings grout and prep in as sub-lines, fixes names FloorRight cut short, and checks every line against your Import Rules. Untick what should stay out, then Transfer to Estimate Quote. Nothing is priced: you add the labor and material prices.


Why import instead of retype?
Retyping a takeoff is where the expensive mistakes happen: a 1 in place of a 7, a room left off, square feet typed where the grid wanted square yards. On a big job it also costs an hour of the estimator’s day.
Import Takeoff reads the Job Summary you already print from FloorRight, checks every line before it goes in, and fills the Estimate Quote with the quantities, units and notes, so you can go straight to pricing.
The four steps
- Open the takeoffImport from Other Software › FloorRight.
- Check the linesType, quantity, waste and location, line by line.
- Fix or leave outRight-click to edit; untick to leave out.
- TransferInto a new or existing estimate, any sheet.
1Open the FloorRight Job Summary

In FloorRight, save the Job Summary as a PDF. In CFE BidWise, click Import from Other Software on the dashboard and pick FloorRight, then Open a takeoff PDF, or drop the file on the page.
The PDF is read on this computer and is not uploaded anywhere. The app tells by itself which program the report came from.
2Check each line in the preview

The Import preview lists every line with its Code, the Type your Import Rules gave it, the description, the Qty and Units. The Checks column shows the waste in the quantity and the net, such as Waste 12% in Qty, net 2,214.36 sf on the LVT.
FloorRight cuts long names short on its report, so the check says how each was read: CARPE read as CARPET, TIL read as TILE. The waterproofing and grout under the wall tile are their own lines on the takeoff, so they come in as sub-lines with their own quantities.
Read the yellow Checks before you transfer. A TBD sub-line is the takeoff telling you something is missing, and it is cheaper to ask now than after the bid.
3Fix a line or leave it out

Click a description, quantity or units to type over it. Right-click a line to copy it, insert a row, delete it or add a sub-line. Untick the Import box on a line to leave it out.
Below, Project Notes collects the notes on the takeoff, the customer information and the FloorRight file name, and goes into the estimate’s notes. Not imported lists what was skipped: the price columns, which are $0.00 on a takeoff, the subtotal rows, the page numbers, and the material qty, because the multiplied qty already includes the multiplier.
4Transfer to the Estimate Quote


Click Transfer to Estimate Quote. Choose A new estimate quote, or An existing estimate for a change order or alternate on a bid you already have, and which sheet: the Estimate Quote, an alternate or a change order.
The lines are added after the last used row, so nothing on the sheet is replaced. A green bar says what was transferred, with Undo transfer. Nothing is priced: labor, material price and attic % stay blank for you.
Worked example: Lakeview Community Clinic
The FloorRight Job Summary for Lakeview Community Clinic had 5 lines and 2 sub-lines:
| Code | Type | Qty | Check |
|---|---|---|---|
| CPT-01 | Carpet | 1,960 sy | CARPE read as CARPET, waste 6.38% |
| CPT-02 | Carpet | 214 sy | Waste 6.31%, net 201.3 sy |
| LVT-01 | LVT / plank | 2,480 sf | TI read as TILE, waste 12% |
| TL-01 + Waterproofing + Grout | Tile | 688 sf + 613 sf + 613 sf | Own lines on the takeoff |
| SV-01 | Sheet vinyl | 1,240 sf | Waste 12.2%, net 1,105.2 sf |
5 lines and 2 sub-lines went into JR-260113 in one click, with the customer information in Project Notes.
What to do next
Importing from another program? See the Measure Square 8 import guide, the RFMS Measure import guide and the Excel or CSV import guide.
Import your next FloorRight takeoff
Import Takeoff is part of CFE BidWise. Start with the 30-day free trial, no credit card.
Frequently Asked Questions
Which FloorRight report do I use?
The Job Summary, saved as a PDF. CFE BidWise reads its multiplied quantity, net material area, and grout and prep lines.
Is my takeoff uploaded anywhere?
No. The PDF is read on your computer and stays there.
Does the import price the lines?
No. Quantities, units, descriptions and notes come in; labor, material price and attic % stay blank for you to price.
Can I import into a change order?
Yes. Choose An existing estimate and pick the change order or alternate sheet, or add a new change order.
Last updated:
