In-House Pay keeps what each of your installers is paid, standard and prevailing. Type the hourly rate and the burden in the yellow boxes, and BidWise works out the loaded $/hr, the overtime, weekend and double time rates, and one day. Then it adds the crew: Crew A costs $1,087.68 a day at standard wage and $1,615.68 at prevailing wage, $528 more. Only the Master user, with the Accounting password, sees it.

  • 5 minutes
  • Intermediate
  • CFE BidWise Business
CFE BidWise In-House Pay: standard wage and prevailing wage multipliers, and a crew day of $1,087.68 standard and $1,615.68 prevailing
Video walkthrough · 4:07 · Guide 92 of 100

Why keep pay in BidWise?

A prevailing wage job can cost half again as much per crew day. If the bid or the job budget uses the standard rate, the job loses money from the first day.

In-House Pay gives job costs the real loaded rate for every installer and every crew, standard or prevailing, so the office only types days and hours.

The five steps

  1. Open In-House PayAccounting, In-House Pay.
  2. Each installer’s payHourly rate and burden.
  3. Prevailing wageBoth side by side.
  4. The crew dayStandard $1,087.68, prevailing $1,615.68.
  5. What can go wrongThe wrong wage on a job.

1Open In-House Pay

CFE BidWise In-House Pay standard wage multipliers: regular 1, overtime 1.5, weekend 1.5, double time 2, team average loaded $/hr and Crew A Marco day
Standard wage multipliers: 1, 1.5, 1.5 and 2.

On the Accounting tab, click In-House Pay. It says Master only: only people who can open Accounting, with its password, see what installers are paid.

Standard wage has the multipliers: Regular 1, Overtime 1.5, Weekend 1.5 and Double time 2. Type them in the yellow boxes. Next to each, the team average loaded $/hr and what a Crew A day costs at that rate, $1,087.68 regular.

2Type each installer’s pay and burden

CFE BidWise Installers pay standard wage: Marco Silva lead foreman burden 32% $42, Andre Silva journeyman $36, Kevin Tran apprentice 70% $25, Luis Ortega foreman $40, Dante Moore $34, Sam Pacheco apprentice 60% $22, with loaded regular and overtime
Each installer: level, burden %, hourly rate, loaded regular and overtime.

Under Installers · pay, each installer from Settings › Installers is listed with their level. Type the Burden %, the taxes, workers comp and benefits, here 32, and the Standard $/hr: Marco $42, Andre $36, Kevin $25.

BidWise works out the loaded rate: $42 × 1.32 = $55.44 regular, $83.16 overtime, $110.88 double time, and $443.52 for one 8-hour day.

3Add the prevailing wage rates

CFE BidWise In-House Pay both side by side: prevailing $/hr Marco 58.5, Andre 54, Kevin 40.5, with regular, overtime, weekend, double time and one day $617.76
Both side by side: the prevailing rate for each installer.

Click Both side by side. Type each installer’s Prevailing $/hr from the wage sheet for the job’s county: Marco $58.50, Andre $54, Kevin $40.50.

The same burden and multipliers apply: Marco is $77.22 regular and $617.76 a day at prevailing wage, against $443.52 at standard.

Quick Tip

Update the prevailing rates every time the wage sheet changes, and before you bid a public job. The crew day cost on every prevailing job comes from these boxes.

4Read what one crew day costs

CFE BidWise A crew day: 3 men, 8 hours, Crew A Marco, standard wage $1,087.68, prevailing wage $1,615.68, prevailing wage jobs cost $528.00 more, 49%, a crew day
Crew A: $1,087.68 standard, $1,615.68 prevailing, +$528 a day.
CFE BidWise Crews one crew day: Crew A Marco with Marco Silva, Andre Silva and Kevin Tran $1,087.68, Crew B Luis $1,013.76, with overtime hour, weekend day and double-time day
Each crew’s day, from the people on it.

A crew day adds up the people on the crew for 8 hours. Crew A, Marco, Andre and Kevin, costs $1,087.68 at standard wage and $1,615.68 at prevailing wage: +$528.00 (+49%) a crew day.

Below, Crews · one crew day lists every crew: Crew B is $1,013.76, with the cost of an overtime hour, a weekend day and a double-time day.

5What can go wrong, and how to fix it

CFE BidWise prevailing wage multipliers, used on jobs whose estimate says Prevailing Wage = Yes, or Labor Rates Labor Wage = Prevailing
Prevailing is used on jobs whose estimate says Prevailing Wage = Yes.

A public job is costed at standard wage. Prevailing rates are used on jobs whose estimate says Prevailing Wage = Yes, or Labor Rates › Labor Wage = Prevailing. Set it on the estimate.

The crew day looks low. Check who is on the crew under Settings › Installers, and the burden %.

Someone else can see the pay. Lock Accounting with its password. Installers in Settings only shows names and levels.

Worked example: Crew A, standard and prevailing

Crew A is three men for 8 hours, with 32% burden:

InstallerStandard $/hrDayPrevailing $/hrDay
Marco Silva, foreman$42.00$443.52$58.50$617.76
Andre Silva, journeyman$36.00$380.16$54.00$570.24
Kevin Tran, apprentice 70%$25.00$264.00$40.50$427.68
Crew A day$1,087.68$1,615.68

A 10-day prevailing wage job costs $5,280 more in crew labor than the same job at standard wage.

What to do next

Next: see a job’s labor budget in crew days.

Know what every crew day costs

In-House Pay is part of CFE BidWise Business. Start with the 30-day free trial, no credit card.

Download Free for Windows64-bit · 30-day free trial · no credit card

Frequently Asked Questions

Who can see In-House Pay?

Only people who can open Accounting, with its password. Settings, Installers only shows names, leads, levels and crews.

What is the burden?

Taxes, workers comp and benefits, as a percent on top of the hourly rate. 32% turns $42 into $55.44 an hour.

When is prevailing wage used?

On jobs whose estimate says Prevailing Wage = Yes, or Labor Rates, Labor Wage = Prevailing.

Cristian Valcu, founder of Commercial Flooring Estimating LLC

Written by

Cristian Valcu – Founder & CEO, Commercial Flooring Estimating LLC

Cristian has estimated commercial flooring for over 20 years and built CFE BidWise around the way flooring contractors actually price, propose and track their bids.