CFE guide · Accounting
In-House Pay: Standard vs Prevailing Wage
In-House Pay keeps what each of your installers is paid, standard and prevailing. Type the hourly rate and the burden in the yellow boxes, and BidWise works out the loaded $/hr, the overtime, weekend and double time rates, and one day. Then it adds the crew: Crew A costs $1,087.68 a day at standard wage and $1,615.68 at prevailing wage, $528 more. Only the Master user, with the Accounting password, sees it.


Why keep pay in BidWise?
A prevailing wage job can cost half again as much per crew day. If the bid or the job budget uses the standard rate, the job loses money from the first day.
In-House Pay gives job costs the real loaded rate for every installer and every crew, standard or prevailing, so the office only types days and hours.
The five steps
- Open In-House PayAccounting, In-House Pay.
- Each installer’s payHourly rate and burden.
- Prevailing wageBoth side by side.
- The crew dayStandard $1,087.68, prevailing $1,615.68.
- What can go wrongThe wrong wage on a job.
1Open In-House Pay

On the Accounting tab, click In-House Pay. It says Master only: only people who can open Accounting, with its password, see what installers are paid.
Standard wage has the multipliers: Regular 1, Overtime 1.5, Weekend 1.5 and Double time 2. Type them in the yellow boxes. Next to each, the team average loaded $/hr and what a Crew A day costs at that rate, $1,087.68 regular.
2Type each installer’s pay and burden

Under Installers · pay, each installer from Settings › Installers is listed with their level. Type the Burden %, the taxes, workers comp and benefits, here 32, and the Standard $/hr: Marco $42, Andre $36, Kevin $25.
BidWise works out the loaded rate: $42 × 1.32 = $55.44 regular, $83.16 overtime, $110.88 double time, and $443.52 for one 8-hour day.
3Add the prevailing wage rates

Click Both side by side. Type each installer’s Prevailing $/hr from the wage sheet for the job’s county: Marco $58.50, Andre $54, Kevin $40.50.
The same burden and multipliers apply: Marco is $77.22 regular and $617.76 a day at prevailing wage, against $443.52 at standard.
Update the prevailing rates every time the wage sheet changes, and before you bid a public job. The crew day cost on every prevailing job comes from these boxes.
4Read what one crew day costs


A crew day adds up the people on the crew for 8 hours. Crew A, Marco, Andre and Kevin, costs $1,087.68 at standard wage and $1,615.68 at prevailing wage: +$528.00 (+49%) a crew day.
Below, Crews · one crew day lists every crew: Crew B is $1,013.76, with the cost of an overtime hour, a weekend day and a double-time day.
5What can go wrong, and how to fix it

A public job is costed at standard wage. Prevailing rates are used on jobs whose estimate says Prevailing Wage = Yes, or Labor Rates › Labor Wage = Prevailing. Set it on the estimate.
The crew day looks low. Check who is on the crew under Settings › Installers, and the burden %.
Someone else can see the pay. Lock Accounting with its password. Installers in Settings only shows names and levels.
Worked example: Crew A, standard and prevailing
Crew A is three men for 8 hours, with 32% burden:
| Installer | Standard $/hr | Day | Prevailing $/hr | Day |
|---|---|---|---|---|
| Marco Silva, foreman | $42.00 | $443.52 | $58.50 | $617.76 |
| Andre Silva, journeyman | $36.00 | $380.16 | $54.00 | $570.24 |
| Kevin Tran, apprentice 70% | $25.00 | $264.00 | $40.50 | $427.68 |
| Crew A day | $1,087.68 | $1,615.68 |
A 10-day prevailing wage job costs $5,280 more in crew labor than the same job at standard wage.
What to do next
Next: see a job’s labor budget in crew days.
Know what every crew day costs
In-House Pay is part of CFE BidWise Business. Start with the 30-day free trial, no credit card.
Frequently Asked Questions
Who can see In-House Pay?
Only people who can open Accounting, with its password. Settings, Installers only shows names, leads, levels and crews.
What is the burden?
Taxes, workers comp and benefits, as a percent on top of the hourly rate. 32% turns $42 into $55.44 an hour.
When is prevailing wage used?
On jobs whose estimate says Prevailing Wage = Yes, or Labor Rates, Labor Wage = Prevailing.
Last updated:
