Commission on the Sample Jobs: Only Accepted Change Orders and Alternates Count

Open a won bid and look at Change orders and alternates. Each one has a status. Only Accepted ones count: a denied alternate reads Denied · not counted. On the Commission tab, COs + alternates adds only the accepted ones to the Job Sub Total, and commission is figured from that, never from the full bid price.

  • 3 minutes
  • Beginner
  • Free BidWise Demo
BidWise Sales bid MD-100003: Alternate #1 accepted, Alternate #2 denied not counted, Change Order #1 accepted
Video walkthrough · 2:42 · Guide 144 of 144

Why it matters

An alternate the GC turned down was never sold. Paying commission on it, or counting it toward a target, makes the numbers look better than the job.

BidWise Sales counts a change order or alternate only once it is accepted, the same way the office counts it, so the salesman and the company see the same commission.

The 4 steps

  1. Open a won bidJob Bid Board › MD-100003.
  2. Check the statusesAccepted or Denied.
  3. Open My commissionCommission tab.
  4. Find the jobCOs + alternates.

1Open a won bid

BidWise Sales bid MD-100003 Maple Grove Elementary, Won: Job Total 156,871.2, Job Sub Total 106,703.25, profit 22.87 percent margin
Job Total for sales, Job Sub Total for commission.

On the Job Bid Board, click MD-100003 Maple Grove Elementary – Classroom Wing, a won job.

The Job Total is the full bid price the GC sees; it tracks your sales. The Job Sub Total is what commission is figured from: material, labor, freight, subs and profit, before tax, bond, burden and contingency.

2Check each change order and alternate

Change orders and alternates: Alt 1 accepted 1,915 sub total, Alt 2 denied by the GC 29,952 not counted, CO 1 accepted 3,267; change orders and alternates count only once accepted
Alt 2 is Denied, not counted. Alt 1 and CO 1 are Accepted.

Under Change orders and alternates, Alt 1 and CO 1 are Accepted. Alt 2, moisture mitigation worth $29,952, was denied by the GC, so it is grayed out and reads Denied · not counted.

The line under the table says it: change orders and alternates count only once accepted.

3Open My commission

BidWise Sales My commission: 125,182 for 2026, Won Job Sub Totals 1,865,456 with change orders and accepted alternates, gross profit 405,689, Tier Incentive
Won Job Sub Totals: with change orders and accepted alternates.

Click Commission. It is private: only you see it. Won Job Sub Totals reads $1,865,456, for commission, with change orders and accepted alternates.

4Find the job in the won jobs table

My commission won jobs: DE-100003 Maple Grove Elementary, Job Sub Total 106,703, COs plus alternates 5,182, Sub Total with COs 111,885, commission 8,523 potential
COs + alternates: $5,182, only the accepted two.
My commission won jobs: Sub Total with COs 111,885, profit 22.97 percent, gross profit 25,697, tier points 1.45, commission 8,523 potential
Sub Total with COs $111,885, commission $8,523 Potential.

Search the won jobs for Classroom Wing. COs + alternates is $5,182: Alt 1 at $1,915 plus CO 1 at $3,267. The denied $29,952 is not there.

The Sub Total with COs is $111,885, and the commission, $8,523, stays Potential until the job closes.

Quick Tip

Commission is always figured from the Job Sub Total, before tax, bond, burden and contingency, never from the total bid price.

Worked example: Maple Grove Elementary

MD-100003, won 04/08/2026:

LineSub totalStatusCounts?
Job Sub Total$106,703WonYes
Alt 1$1,915AcceptedYes
Alt 2$29,952DeniedNo
CO 1$3,267AcceptedYes
For commission$111,885$8,523 potential

The same rule as CFE BidWise’s Sales Commission sheet, in all 5 commission systems.

What to do next

Next, set how your company pays you in BidWise Sales commission setup. Or see all the step-by-step guides.

See your commission

Download the free BidWise Demo and open the BidWise Sales Demo on 40 sample jobs. The demo runs on its own sample data, so nothing touches your real jobs.

Download the free BidWise DemoWindows 64-bit · 40 sample jobs · no credit card

Frequently Asked Questions

Do change orders count toward commission?

Yes, once accepted. Denied ones are not counted.

Is commission figured from the bid price?

No. From the Job Sub Total, before tax, bond, burden and contingency.

When is commission final?

When the job closes and you type the profit % it closed at. Until then it shows Potential.

Cristian Valcu, founder of Commercial Flooring Estimating LLC

Written by

Cristian Valcu – Founder & CEO, Commercial Flooring Estimating LLC

Cristian has estimated commercial flooring for over 20 years and built CFE BidWise around the way flooring contractors actually price, propose and track their bids.