Before You Send the Number: A Bid-Day Checklist for Commercial Flooring

Color-coded Callidus flooring takeoff with a material keycode legend

Bid day is the worst time to find a problem in a flooring takeoff, and it is also when most of them are found. The number is due at 2:00, the supplier quote came in at noon, and somebody notices that the second floor corridors are not in the takeoff. A short checklist, run the day before, catches most of that while there is still time to fix it.

These are the ten checks we use at Commercial Flooring Estimating, after more than 20 years of commercial flooring takeoffs.

1. Every finish code is on the plan, and every plan code is in the schedule

Read the finish schedule against the finish plan in both directions. A code on the plan that is not in the legend is a question for an RFI. A finish in the legend that never shows on the plan is usually a missed area, not an unused product.

A keycoded takeoff: each finish placed and labeled on the plan
A keycoded takeoff: each finish placed and labeled on the plan

2. The latest addenda are in

Check the addendum numbers against the bid form, and look for revised finish plans, new alternates and changed specs. A changed base height or a swapped carpet tile changes the quantity and the price.

3. The scale is right on every sheet

Verify the scale with a known dimension on each sheet, not once per set. Enlarged plans and reduced sets are where takeoffs drift.

4. Roll width, seams and pattern repeat drive the material

For broadloom, sheet vinyl and linoleum, net square feet is not what you buy. Roll width, seam placement, direction and pattern match decide the cuts. A seam layout shows where the drops go and whether they can be used elsewhere on the job.

5. Waste is set by product and layout, not one number for the job

Carpet tile in an open office, plank in a herringbone, and tile in small restrooms do not waste the same. Set waste per product and per area, and keep attic stock separate from waste so the spec requirement is visible.

6. Base, transitions and stairs are counted

Wall base by linear foot and type, inside and outside corners, transitions at every change of material, and stair treads, risers and nosings. These lines are small on their own and large together.

7. Prep and moisture are priced, or clearly excluded

Read the spec for floor prep, leveling, moisture testing and mitigation. If the spec calls for it and the bid is silent, the GC will assume it is included.

8. Alternates and unit prices are separate

Price each alternate on its own, as an add or deduct, and fill in every unit price on the bid form. Folding an alternate into the base bid makes the base number lose.

9. Labor matches the job, not last year's job

Check man days against the real conditions: occupied building, phasing, night work, prevailing wage, travel. In CFE BidWise each line carries its own Labor GP and Material GP, so you can see where the profit sits before you tighten the number.

An estimate with Labor GP and Mat'l GP on every line in CFE BidWise
An estimate with Labor GP and Mat'l GP on every line in CFE BidWise

10. Exclusions and qualifications are written down

Furniture moving, after-hours work, floor protection, removal and disposal, and sealing or waxing. If it is not in the scope, put it in the exclusions on the proposal, in plain words.

When there are too many bids for one estimator

The checklist only works when there is time to run it. In a week with five bids due, the takeoffs themselves eat that time. That is where outside takeoff help fits. CFE prepares commercial flooring material takeoffs in Callidus, with color-coded drawings and quantities by finish, so your estimator can spend bid week on checks, pricing and the proposal. See sample takeoffs or ask about a free takeoff.

Questions

What is the most common flooring takeoff mistake?

Missing or mismatched finish codes: a room on the plan with a code that is not in the finish schedule, or a finish listed but never placed. Checking every code against the legend catches most of them.

Can CFE check a takeoff before bid day?

Yes. CFE prepares commercial flooring material takeoffs with Callidus, with color-coded drawings and quantities by finish, and can take on selected takeoffs during a busy bid week.

Cristian Valcu, founder of Commercial Flooring Estimating LLC

Written by

Cristian Valcu – Founder & CEO, Commercial Flooring Estimating LLC

Cristian Valcu is a U.S.-based commercial flooring estimator with over 20 years of experience estimating with Callidus software in the commercial flooring industry. He is an expert in reading and interpreting floor plans, specifications and project-related information, and in producing full takeoff reports with quality material takeoffs based on all available bid documents.

View Cristian’s full experience on LinkedIn →