How to Read a Flooring Finish Schedule

A finish schedule lists each room with its floor, base, wall and ceiling finishes by code; the finish legend defines each code's product, size and color; and the finish plan shows where each floor finish goes, including patterns and transitions. Read all three together with the specification, because they often disagree, and every disagreement is a bid question.

Callidus shop drawing of an office floor keycoded by carpet tile product, LVT plank and porcelain tile
Callidus® shop drawing: office floor keycoded by carpet tile product, LVT and tile.

The three documents that define flooring scope

DocumentWhat it tells youWhere it is
Room finish scheduleFloor, base, wall and ceiling finish codes for every roomUsually on an A-series or interior (I-series) sheet
Finish legendWhat each code means: manufacturer, product, size, color, installation notesInterior finish sheets, sometimes in the project manual
Finish planWhere each floor finish occurs, pattern direction, transitions and accent areasInterior finish plans by floor

Common flooring codes

CodeUsually means
CPTBroadloom carpet
CTCarpet tile (sometimes ceramic tile; check the legend)
LVTLuxury vinyl tile or plank
VCTVinyl composition tile
SV / RSFSheet vinyl / resilient sheet flooring
RF / RTRubber flooring / rubber tile
RBRubber base
RES / EPResinous or epoxy flooring
PC / SCPolished concrete / sealed concrete
TS / TRTransition strip / threshold

Abbreviations vary by architect. Always confirm codes in the project's own legend.

Conflicts to look for

  • A room tag on the plan that differs from the finish schedule
  • A code on the plan that is not in the legend
  • A product in the legend that the specification does not include
  • Base codes missing for rooms that receive flooring
  • Pattern or direction arrows that conflict with the installation method in the specification
  • Addenda that change a finish but not every sheet that shows it

Each conflict should become a qualification or an RFI, so your bid says what it carries. See flooring bid qualifications and exclusions.

Reading for quantities

As you read, list each finish code with its rooms and any notes that affect quantities: roll width, tile size, installation method, cove height and attic stock. That list becomes the backbone of your takeoff. The full process is in how to do a commercial flooring takeoff.

Frequently Asked Questions

What is a room finish schedule?

A room finish schedule is a table on the drawings that lists each room with the finish codes for its floor, base, walls and ceiling.

What does CPT mean on a finish plan?

CPT usually means carpet, typically broadloom. Always confirm the code in the project's finish legend, because abbreviations vary.

What should I do when the finish plan and schedule disagree?

Note the conflict, choose a stated assumption for your bid, and send a question or RFI to the general contractor or designer so it can be resolved.

Where is the finish schedule in a drawing set?

Usually on an architectural or interior finish sheet, often near the finish plans, and sometimes in the project manual. The sheet index lists where it is.

What does a keycoded plan add to a finish schedule?

A keycoded plan colors every area by its finish code, so you can see at a glance where each material goes and check that every room has a finish.

Need this takeoff done for your next bid?

Send your plans and specs. Most CFE takeoffs are completed within 24–48 business hours of receiving complete documents.

Request PricingTry a Free Takeoff
Cristian Valcu, founder of Commercial Flooring Estimating LLC

Written by

Cristian Valcu – Founder & CEO, Commercial Flooring Estimating LLC

Cristian Valcu is a U.S.-based commercial flooring estimator with over 20 years of experience estimating with Callidus software in the commercial flooring industry. He is an expert in reading and interpreting floor plans, specifications and project-related information, and in producing full takeoff reports with quality material takeoffs based on all available bid documents.