CFE BidWise · User Guide

Step-by-step help, setup aids, troubleshooting and common questions.

🚀Getting started
Welcome

CFE BidWise prices commercial flooring bids, and then runs the jobs you win. One estimate holds the Estimate Quote, its Change Orders and Alternates, the proposals (Unit List, L&M, Lump Sum), the RFIs, the Submittal, the Work Orders, the sub-contractor profiles and its own Job Folder of plans, specs and emails.

Once a bid is Won, the Ordering, Warehouse, Schedule, Invoicing and Accounting tabs order the material, receive it, book the install, bill the GC and keep the books for your accountant.

This guide follows the app from the first start to the last printout. Click a chapter on the left to open it, then pick a topic. Type a word in Search the guide at the top to find every topic that mentions it.

CFE BidWise Personal
Good to knowYou are on CFE BidWise Personal, so this guide shows what CFE BidWise Personal does. Parts that only CFE BidWise Business has show as a short line with 🔒, so you know they exist. See CFE BidWise Personal and CFE BidWise Business.
TipTopics that belong to a screen have an Open this screen button, so you can read and try at the same time.
What you need
  • Windows 10 or Windows 11, 64-bit.
  • Microsoft Edge WebView2 Runtime. It is built into Windows 11 and most Windows 10 PCs. If it is missing, see Troubleshooting › Start-up and installing.
  • A screen of 1366 × 768 or larger. The screens are drawn for 1920 × 1080 and scale with the window.
  • Internet for the first sign-up, the license check and email. Estimating itself works offline.
Installing the app
  1. Click Download on the CFE BidWise download page (or the link BidWise sent you). Your browser saves CFE-BidWise-Setup.exe, a 4 MB setup file signed by Commercial Flooring Estimating LLC.
  2. Double-click it, tick I agree, click Install and say Yes to Windows. It adds Microsoft Edge WebView2 if the PC needs it and installs the program.
  3. Click Open BidWise on the last page. Next time, start it from the CFE BidWise icon on the desktop or the Start menu.
CFE-BidWise-Setup.exeFor everyone. About 4 MB; it fetches the newest version while it installs.
CFE-BidWise-Setup-Offline.exeFor PCs with slow or blocked internet. WebView2 is inside.
CFE-BidWise-version.msiFor IT departments (Group Policy, Intune or a silent install).
Good to knowAll three install the same program, and updates come by themselves (see Updates). Your estimates live in Documents\CFE Estimating, not in the program folder.
First start: create your user
  1. On the sign-in card press Create new user.
  2. Type your name, initials, email, a username and a password (at least 8 characters with a letter and a number). Your initials go in front of every bid number, for example CV-100001.
  3. Create the user. A 6-digit code is emailed to you.
  4. Type the code and press Verify and continue. No email? Press Send a new code, and check the spam folder.
  5. The app shows your recovery code. Print it or write it down and keep it away from this PC. It lets you set a new password without email. Press I saved it · continue.
  6. Read the End-User License Agreement and accept it.
Good to knowThe first account on a PC is the Admin. The Admin manages the users and the company settings. Each user gets their own Dashboard and estimates.
Signing in and out
  1. Type your username and password and press Enter.
  2. To switch users or sign out, click your name at the top right › Switch user or Log out.
Start your free trial or register

A new copy runs as a free 30-day trial with every function on 1 computer (team invites and the company copy wait until you pay). After the trial it opens in Limited Mode until you register (see License, team and computers).

During the trial a Try as Personal | Business switch sits next to the TRIAL badge on the title bar. It starts on Business. Flip it to see the same bids the way CFE BidWise Personal shows them (simpler, with Business-only parts locked), then flip back. Nothing is bought; the switch goes away when the trial ends or you buy a plan.

  1. Open About › License info.
  2. To try it: type your email and press Start free trial.
  3. To buy: pick CFE BidWise Personal · just me ($69.99 a month; tick I'm self-employed or the owner of my business) or CFE BidWise Business · my company ($129.99 a month per user, any number of users). Choose 1 month, 6 months or 12 months and press the checkout button. The secure Stripe checkout opens in your browser (the receipt comes from Link, a Stripe company).
  4. After paying, copy the license key from the email BidWise sends you, paste it in the license key box and press Activate. All functions unlock with no restart.
BidWise Demo: try it with sample jobs first

BidWise Demo is a separate free download (BidWise-Demo.msi) for trying BidWise before your own trial. It installs next to the real CFE BidWise without touching it, with its own orange icon, folder and shortcuts.

Type your name, company and email; a 6-digit key is emailed to you. The demo opens as Demo Flooring Company with 40 made-up jobs in every project phase, with Job Folders and takeoff reports to import. The orange strip under the ribbon has a Personal | Business switch and a link to the 30-day free trial. Reset sample jobs starts them over.

Try your own takeoff: on Home › Import Takeoff drop a Callidus, Measure Square 8, RFMS Measure or FloorRight takeoff PDF on the box (or press the link, or Open PDF on the ribbon). The lines go into a demo estimate and the PDF is filed in its Job Folder.

Home › Import Takeoff: drop the takeoff PDF on the box. The same screen works in BidWise Demo.
Home › Import Takeoff: drop the takeoff PDF on the box. The same screen works in BidWise Demo.
Good to knowThe demo runs 30 days. Email, payments, QuickBooks, teams, phones, TV boards, cloud backups, exporting and saving files are off (a pop-up says they work in the real CFE BidWise). Three things do work with files, so you can try them: importing your own takeoff PDFs, importing a vendor list from Excel or CSV (Client Info › Vendors), and saving the Accountant pack to Excel. Prints carry a SAMPLE watermark, and its .cfe files do not open in the real app. It updates itself when a new version is out.
CFE BidWise Personal and CFE BidWise Business

CFE BidWise comes in two plans, CFE BidWise - Personal and CFE BidWise - Business (CFE BidWise Personal and CFE BidWise Business for short; the title bar shows a PERSONAL or BUSINESS tag). Both have the same estimating, proposals, Job Folder, Ordering, Warehouse, Schedule, Invoicing and Accounting tabs, and keep the same data, so switching from Personal to Business carries everything over.

CFE BidWise PersonalJust you, 1 user. Each tab is the simpler, less busy version: the everyday steps, fewer boxes and columns. Your saved .cfe files open only on your own Personal license.
CFE BidWise BusinessYour company, any number of users. Adds the team (invites, Master user, company copy of bids, a shared Job Folder) and the advanced parts of each tab: purchase orders, progress billing and pay apps, retainage, receivables, job costs, WIP, crews on the schedule, the full Accounting reports, QuickBooks Online and the warehouse TV screens.
CFE BidWise Personal

In this guide, a Business-only part shows as a 🔒 line that says it comes with CFE BidWise Business. To switch, the Master user opens About › License info › Switch to Business and add a team member (see License, team and computers).

CFE BidWise Business

In this guide, parts only CFE BidWise Business has carry a purple CFE BidWise Business label. Teammates on CFE BidWise Personal see those parts as a 🔒 line.

Set up your company first

Before your first proposal, an Admin fills in the company settings once. Every user and every new estimate uses them.

  1. Open the Settings tab. An amber dot on it means something required is still empty; hover it to see what.
  2. Company info: company name, address, phone, email, website, contractor license and classification, and your logo (JPG or BMP, up to 500 KB).
  3. Proposal text: your Terms & Conditions, Exclusions, Qualifications and the other boxes printed at the bottom of proposals.
  4. Defaults: tax rates, Labor and Material GP %, units, commission type, bond and contingency, the bid number format and the next bid number.
  5. My Signature: who signs your proposals.
  6. Press 💾 Save settings.
The screen at a glance
Title bar and quick bar

The top bar shows the screen name and the bid you have open. The small icons in the middle are your quick bar: your favorite tools. Hover over an icon to see what it does; click ⚙ on the bar to choose the tools (see Settings › Customize Ribbon). The yellow pill on the right shows your trial or license.

With an estimate open, the Estimate | Job badge on the title bar names it on every tab. Its ✕ closes the estimate from any screen, the same as Ctrl + W (see The left menu).

Menu tabs and ribbon

The tabs Home, View, Insert, Integrate, Client Info, Reports, Ordering, Warehouse, Schedule, Invoicing, Accounting, Settings, Help, About and Rate Me each open a ribbon of buttons. The Home ribbon changes with the screen you are on: on the Estimate Quote it holds Save, Clipboard, Line items, Bold, Profit mode, Calculate and Output; on a proposal it holds Edit Proposal, Undo and Output.

A button marked BUSINESS belongs to CFE BidWise Business; on CFE BidWise Personal it says what it does and that it comes with CFE BidWise Business.

The ribbon button of the screen you are on is dark (selected). A button that opens a window, such as Book install, Day note or Day off on the Schedule, stays dark while its window is open; when you close the window the screen's own button is dark again.

Your own tabs: order, colors and hiding

Each person can set up the row of tabs their own way. Right-click a tab for the quick menu, or open About › Account › 🎨 Customize my tabs… for the whole list.

Move a tabDrag it along the row, or right-click › Move to first, Move left or Move right.
Color a tabRight-click › pick a color under Tab color (or No color).
Hide a tabRight-click › 👁 Hide this tab, or right-click the empty part of the row and untick it. Hidden tabs wait under the + at the end of the row; click it to open one or to show it again. A red count on the + means a hidden tab has reminders.
Open on my first tabIn Customize my tabs, CFE BidWise can open on the first tab of your row.
Start overRight-click › ↺ Reset to the standard look.
Good to knowHome, View, Insert, Client Info, Reports, Settings, Help, About and Rate Me can move but cannot be hidden. Nothing is turned off: a hidden tab's reminders and links keep working. On a CFE BidWise Business team your tabs follow you to every PC you sign in on; otherwise they are kept on this PC.
The File menu

File (the blue tab on the left) opens Info, New, Open, Save, Save As, Print, Print to PDF, Share, Export, Import, Close and Account. Press Esc or Back to return to your screen.

The left menu

With an estimate open, a yellow box at the top of the left menu shows the estimate number (and the JOB number once it is Won), with the 📁 Job Folder right under it. Under it the menu lists every sheet: Estimate Quote, SAMPLE, Change Orders, Man Day Rates, Project Man Days, Labor Rates, Sales Commission, the proposals, Forms, Sub Contractors, Work Orders and the Calculator. Click a name to open it. The small ✕ on the yellow box closes the estimate (the same as File › Close or Ctrl + W): if there are changes it asks Save, Don't save or Cancel, then goes back to the Dashboard with nothing open. The ‹ button on its edge hides the menu for more room. Right-click a name to duplicate, rename, delete or move it; Reset menu order puts it back.

The same Estimate and Job number show on the title bar on every tab. The Material List is on the Ordering tab and the Work Order for Warehouse on the Warehouse tab.

The status bar

The bottom line shows whether you are online, the version (Online · up to date), your profile, your plan and where your database is.

Updates

When a newer version is out, a window says so when the app starts, and a green Update x.y.z pill shows on the title bar next to your name. Click it to update. You can also press About › ⟳ Check for updates.

The version you have shows on the start screen, in About and in the footer of every PDF.

One job or all jobs

Ordering, Warehouse, Invoicing and Schedule show either one job or all jobs, never a mix.

This jobWith a Won job open, those tabs open on that job only, with a teal bar naming it (This job · All jobs · Change job ▾). Every tile, table, total and tab count is that job's.
All jobsPress All jobs (or open the tab with no estimate open). The estimate menu slides away and the yellow job number leaves the title bar. Open a job ▾ and ↩ Back to J-… switch back.
TipWith no estimate open the left menu slides away; press › on its edge to show it. ⌂ Dashboard is the first button on the Home ribbon, one click back to the Bid Tracker from any sheet.
Keyboard shortcuts
Ctrl + NNew Estimate Quote
Ctrl + OOpen a .cfe file
Ctrl + SSave (next version v01, v02…)
Ctrl + PPrint (opens the preview)
Ctrl + WClose the open estimate (asks to save first if there are changes)
Ctrl + BBold the Material Description of the line you are on
Ctrl + VPaste rows copied from Excel
Ctrl + mouse wheelZoom in or out
Enter or ↓Next row (Enter on the last row adds a row)
↑Row above
Tab / Shift + TabNext or previous cell
EscUndo the cell you are typing in, or close a window
Drag, Shift + click or Ctrl + clickPick several cells, or several rows from the # column
DeleteClear the picked cells, or remove the picked rows
Ctrl + ZUndo the last change to the table
The SAMPLE estimate

The SAMPLE Estimate is a filled-in bid that shows how materials, prep, adhesive, subs and profit are entered. It is read-only.

  1. Open it from the left menu or Help › SAMPLE walkthrough.
  2. Click any cell to see what it is for in the bar above the grid.
  3. To practice on it, press Copy to new estimate. You get your own copy with the next bid number.
Video Guides

Help › Videos › 🎬 Video Guides shows BidWise's how-to videos inside the app, by chapter, with a search box and the YouTube player. Watch on YouTube opens a video in your browser; Reload and Open in browser are on top. New videos BidWise adds on the website show here at once, with no app update. It needs internet, and it opens in Limited Mode too.

TipThe User Guide's top bar has a link to the Video Guides as well.
☀☀ My day
Your To Do list for the day

The yellow ☀ My day tab, first on the tab row, is your list of what needs you today. Nothing to type: each line comes from what is already in BidWise (Order reminders, Warehouse, Schedule problems, Collect & bill, Ready to bill, Accounting bills due, job follow-ups, Bid follow-ups and Job Check) and only from the areas you may open. The red count is what is Overdue or due Today.

Lines are in the order they are due: Overdue, then Today, then Coming up (the next 3 work days), and inside each the soonest job first. A new Won job lands where its own dates put it, never at the bottom. The list refreshes by itself every minute, so new jobs drop in and finished lines leave. What is not finished stays on tomorrow's list.

Do it, Done and Snooze
Do it ▸The blue button opens the exact screen for that line (Order, Bill it, Book, Pay). Most lines tick themselves off when the work is done there.
✓ DoneFor work done another way (phone, email, website) or not needed, with a note.
💤 SnoozeLater today, tomorrow morning, next Monday or a day you pick. On ordering lines it is the same Snooze as Order reminders.

The Good morning window opens the first time you sign in each morning with your counts and the first 5 lines. Not ready yet? Press ⏰ Remind me in 1 hour, 2 hours, 4 hours or Tomorrow; it waits until no other window is open, and if BidWise was opened before 6 AM or left on overnight it still shows in the morning. Change the time, reminders, notifications, the daily email (7 AM by default) and Count work days only in My day settings. Print gives a page with a tick box in front of each line and a Notes column to write on.

My day by role

Each person's list follows the work they do. Anyone named as the salesman on a bid or a job gets the salesman's lines: bid follow-ups that are due, bids going cold and the Job Check lines set for the salesman. Job Check lines go to the person picked for each check in Job Check settings (project manager, warehouse, accountant or salesman). Each line shows its Area (Invoicing, Bid follow-ups, Schedule, Job Check…), the job and, for a bid, the day it was sent.

CFE BidWise Business

The Master user's list opens on Escalated + mine: their own lines plus any teammate's line that is Overdue 2 days or more (marked + Master). Show: switches between Escalated + mine, Only mine and Everything. The Whose line column says whose line it is, and the Team today chips show each area's count and how many are late.

My day for the Master user: Escalated + mine
My day for the Master user: Escalated + mine, with the Area and Whose line columns and the Team today chips.
I'm on it and Team's day CFE BidWise Business

When 2 or 3 people share ordering or invoicing, press ✋ I'm on it: the others see "Lisa Park is on it" within a minute (Company data sync). Take over… asks her first; a line left from an earlier day can be taken by anyone. When anyone finishes a line it leaves everyone's list and shows "Done by …" in Done today.

Team's day (Master user) lists everyone's open lines, who is on what, and what each person did this month. In My day settings the Master user sets what each role sees, when an Overdue line also goes to the Master user, and whether people can hand lines to each other.

🧭🧭 Project phases
Where every Won job is

Home › Project phases (next to Dashboard) shows each Won job's phase: Contract, Submittals, Ordering, Material coming, Ready to schedule, Scheduled, Installing, Punch list, Billing, Retainage, Closed. Nothing to type: the app works the phase out from the Work Order For Office checklist, Ordering (submittals and the Material List), Warehouse receiving, the Schedule, the crew phones (punch list and Job done) and Invoicing.

On the Dashboard the Bid Tracker has a Phase column and a Won jobs · where we are strip: click a phase on the strip to show only those jobs. Point at a phase to see all the steps; click it for Where are we?: what the app found for each step, what the job is waiting on, the next step date and the history.

History is kept with each job (its last 300 lines) in the company's Project phases data, so it goes to the team with Company data sync and into backups. Every line has the date and time, who (a person, or App when the app moved it), the phase and what happened. It shows newest first, 20 or 50 lines per page; Print in Where are we? prints the whole history.

Waiting on flags CFE BidWise Business

A ⚠ flag shows what the job is waiting on without changing its phase: a change order to sign or still a draft, a submittal sent back (Revise & resubmit), late material, or At risk from Job health. ⚠ Waiting on someone on the strip lists only those jobs.

Set a phase by hand

When you know more than the app (the GC moved the date, a building is waiting on carpet), click ✎ Set phase by hand in Where are we?, or drag a card back to an earlier column on the Board. Keep the phase automatic and just add a note, hold a phase until you change it, or hold it until a date and then go back to automatic. ✎ marks a job set by hand; Go back to automatic undoes it.

Moving a job on CFE BidWise Business

Jobs move in order. In Where are we? the green Next step button is the next real step: in Contract it is ✓ Contract / PO received…; in other phases it opens the screen where the step is done (Material List, Schedule, Job health, Invoices). Dragging a card to a later column on the Board opens the same Move job window.

  1. Contract: PO received (type the PO #), Signed contract (no PO, the signature is enough), Verbal OK from (the person's name), Email OK from (the name on the email), or Not in yet.
  2. Submittals: sent and approved, sent, not needed, or skip. Material: from our stock, customer supplied, nothing to order, or skip and order it on the Material List.
  3. Schedule: tick Book the install to book it right after.
  4. Press Move to …. What you picked is written to Work Order › For Office (status, date, your initials and the note, such as the PO #); anything skipped is written to the job's phase history as skipped.
  5. Dragging a job to Closed (or Retainage) while money is still to bill or collect shows the amount still open; tick Close it anyway (paid outside the app, written off, billed in QuickBooks) to go on. The history says it was closed by hand with that amount open.

Bill ahead of the work: when the client asks to be billed now and the work comes later, drag the job to Billing and pick Bill ahead (tick Make the invoice now). The job stays in its work phase with a 💵 billed ahead flag and payments don't close it; when the install is done it goes on to Billing and Closed.

Board, List, print and the TV CFE BidWise Business

Board has a column per phase, longest in the phase first. Click the phase chips above it to show or hide phases; ⏱ Stuck only shows the late jobs. Cards per column (Fit the screen, 5 to 20, All) gives each column its own ‹ › pages, and ⟳ Rotate pages turns them by itself (it waits while the mouse is on the board). Print on the Board asks Print the board (6 phases side by side per page) or Print the list. List is the standard table with filters, sort, Print and Export. 📺 TV board shows Where we are on the office TV (no prices): on the TV PC pick Show › Where we are in TV setup. ✉ Email the GC an update writes a short update from the phase and adds it to Job notes.

⚙ Phase settings (Master user): turn off phases you don't use (their jobs show in the next phase on), rename them, and set the days after which a job counts as stuck. Take closed jobs off the Board after 30 days (0 keeps them): only jobs paid in full with nothing left to bill or collect. Stuck jobs show red days and remind the job's PM and salesman on ☀ My day. The crew phones show each job's phase on the job page.

🩺🩺 Job Check
What Job Check does

Home › Job Check lists every open Won job, worst first, and flags what will cost money before it does. Nothing to type: each check reads what BidWise already has (Ordering, Warehouse, Schedule, change orders, the Field app, Job costs and Invoicing). Each line says what needs doing, who should do it and by when, with Fix it ▸ (or Bill it ▸) to open the screen where it is done.

At riskWill cost money if nobody acts (for example the crew is installing and material is not here).
WatchComing up this week.
OKEvery check is fine.
Waiting on the GCSite ready or a change order is with the GC.

The same lines show on each person's ☀ My day. The Dashboard has a Job Check box (5, 10, 15 or 25 jobs per page, Hide / Show) and the Bid Tracker can show a Job Check column. Print table, Print Preview and Export are on the list.

Home › Job Check: every open Won job, worst first, with what needs doing, who and by when.
Home › Job Check: every open Won job, worst first, with what needs doing, who and by when.
CFE BidWise Personal

CFE BidWise Personal has the short Job Check: material here before the crew and labor done, nothing billed.

CFE BidWise Business

The topics below explain each check, one job's panel, Site ready and the settings.

The checks CFE BidWise Business
Material here before the crewA line not received, or expected after the install's first day.
Material checked before the next phaseEvery line arrived: someone checks count, dye lots and condition before the job is Ready to schedule.
Site ready (ask the GC)Ask the super “Is the floor ready for us?” and keep the answer.
Change orders signed before CO workA change order sent to the GC and not signed, on a job that is installing or booked.
Labor done, nothing billedThe crew phone says Job done (or the install days are over) and money is left to bill.
Approved CO not billedA signed change order that is on no invoice yet.
Profit slippingJob health forecasts the job below the bid margin.
Pay app before the GC's cut-offThe pay app is due by each GC's cut-off day.
Crew hours over bidCrew days used pass a share of the bid days (off to start).
Retainage still heldThe job is done and retainage is not paid.
Closeout papersFinal lien waiver, warranty letter, care and maintenance sheets and attic stock list.
Good to knowA line says “Nothing needs doing now” when every check is fine today, and counts the later checks apart. Closeout papers stop flagging a job done more than 90 days ago.
One job's Job Check CFE BidWise Business

Click Open Job Check on a line (or Job Check on the ribbon inside a Won estimate). The panel shows the job's phase, the counts (checks OK, need you, waiting on the GC, later steps) and each check under Before the install, While installing and Closeout, with Fix it ▸ on the ones that need you. Tick the closeout papers you sent by hand at the bottom; an unconditional final lien waiver made in BidWise ticks itself.

Print and ✉ Email it to the PM send the panel; Where are we? opens the job's Project phases page.

One job's Job Check: material is not here and the crew started, so it is At risk with Fix it.
One job's Job Check: material is not here and the crew started, so it is At risk with Fix it.
Material check: Ready to schedule

When the last material line arrives, the job waits in Material coming until someone checks it. Open the material check from Job Check (or My day), tick each line that is here and right, type a note (short, damaged, two dye lots) and press ✓ Checked: Ready to schedule. Save, not ready yet keeps what you ticked. Tick Tell the scheduler and Tell the salesman to put it on their My day.

Good to knowOnly lines that arrived in the last 14 days need the check, so jobs that were already Ready stay Ready, and a job whose install has started is never held.
Material check: tick what is here, then Checked: Ready to schedule.
Material check: tick what is here, then Checked: Ready to schedule.
Site ready: ask the GC CFE BidWise Business
  1. A few days before the install (5 to start) the job shows Site ready (ask the GC).
  2. Press Fix it ▸. The window shows the install date and the GC contact.
  3. Press ✉ Email the question, or call and pick the GC's answer (asked and waiting, ready, not ready) with a note, such as a new date.
  4. Press Save the answer. While you wait, the job counts as Waiting on the GC.
Site ready? Email the question to the GC and keep the answer with the job.
Site ready? Email the question to the GC and keep the answer with the job.
Job Check settings CFE BidWise Business

Home › Job Check settings (also on the ⚙ button of the Job Check page). Only the Master user can change them; everyone else sees them read-only. For each check: On, When (days before the install, after it was sent, and so on) and Who gets it in My day.

Under the list: Show Job Check on the Dashboard, Show the Job Check column in the Bid Tracker, how many jobs the Dashboard box shows, and a Monday email of every At risk job to the Master user. GC pay app cut-off days keeps the day of the month each GC wants the pay app by; blank uses the company's day.

Job Check settings: each check on or off, when, and who gets it in My day.
Job Check settings: each check on or off, when, and who gets it in My day.
📊Dashboard and Bid Tracker
The Dashboard

The Dashboard opens after you sign in. It greets you, shows today's date and four cards, and lists your bids in the Bid Tracker. The three blue buttons start a new estimate, upload an existing one, or import a Callidus, Measure Square, RFMS Measure or FloorRight takeoff.

CFE BidWise Business

The Job Check box under the cards lists the open Won jobs that need someone, worst first (see Job Check).

The Dashboard with the Job Check box above the Bid Tracker.
The Dashboard with the Job Check box above the Bid Tracker.
New estimate from a bid invite email
  1. Drag the bid invite email from Outlook onto the Dashboard, or press From bid invite on the Dashboard ribbon and pick the .msg / .eml file or paste the email text.
  2. BidWise reads that one email and fills the project, GC, contact, phone, email, address, bid due date and time, walkthrough, RFI due, spec sections, architect, project # and the plans link.
  3. What is not in the email stays a yellow blank for you to fill in.
  4. The email and its attachments go into the new estimate's Job Folder.
Good to knowBidWise only reads the email you drop or paste. It never reads your mailbox.
The four cards
EstimatesHow many estimates were created in the period, compared with the period before.
Total bid amountThe Total Proposal Price with Change Orders of those estimates.
Open bidsBids still Draft, Sent or Follow-up.
Win rateWon ÷ (Won + Lost), and the total awarded.
  1. Click 📅 This month ▾ on a card.
  2. Pick This month, Last month, This year, Last year or another period. Each card keeps its own period.
Bid Tracker
Finding a bid
  1. Type in 🔍 Search all columns to search every column at once.
  2. Or use the boxes and menus right under the column titles: dates, bid number, project, GC, contact, salesman, labor, PW, amount (type Min – Max, for example 50,000 – 200,000) and status.
  3. Click a column title to sort by it; click again to reverse.
  4. Show: Active ▾ switches between Active, Ignored and All bids.
Opening a bid

Click the bid number or the project name, or the ✎ icon at the end of the row. The 📎 column shows how many files are in the bid's Job Folder; click it to open the folder.

CFE BidWise Business

A red At risk badge on a Won bid means Job health found the job going over its labor or cost budget (see Reports › Job costs and in-house crews).

Choosing the columns
  1. On the Dashboard press Home › Columns, ▦ Columns above the Bid Tracker, or right-click its header row.
  2. Untick a column to hide it; tick it to show it again.
  3. Drag ⋮⋮ to change the order.
  4. ↺ Reset puts every column back. Date, Bid Date, Bid Number, Project Name, Status, the Job Folder and Actions always show.
CFE BidWise Business

The Phase and Job Check columns show where each Won job is and what it needs.

Good to knowYour columns are kept on this computer.
Home › Columns: tick the Bid Tracker columns to show and drag to change the order.
Home › Columns: tick the Bid Tracker columns to show and drag to change the order.
Duplicate for a re-bid

Click ⧉ at the end of the row. The copy gets the next bid number and starts as Draft. Use it when the same project is bid again or to another GC.

Ignore or delete a bid

⊘ hides a bid from the Active list without deleting it (for example a bid you will not follow). Show: Ignored brings it back. 🗑 deletes the estimate after asking you.

TipDeleted by mistake? An Admin can bring it back from a backup: Settings › Save › Restore from backup… › One estimate.
Change Order dots

A colored dot after a bid number stands for each Change Order or Alternate in use: grey Draft, orange Submitted, green Accepted, red Denied. Hover a dot to see its name. Click the dots to show the Change Order rows under the bid, with their own amount and status.

Exporting the list

Home › Export CSV saves the bids as a CSV file that Excel opens.

Bid status
The six statuses
DraftBeing estimated, not sent yet.
SentSent to the GC.
Follow-upYou need to call or email the GC back.
WonAwarded to you. Asks the award amount.
LostAwarded to someone else. Asks why.
On HoldThe project is paused.

Click the status pill in a row and pick the new status. Bids that said Open in older versions now say Sent.

Marking a bid Won
  1. Click the status of the bid › Won.
  2. Award amount starts at your proposal price. Type what the bid was awarded for, for example after a scope change or a buy-down.
  3. Check the Award date (today) and type the Contract or PO number and a Note if you have them.
  4. Press Mark as Won.

The amount shows in the Award Amount column and the Win rate card adds it up. Point at the green Won pill to see the date, PO and note again; pick Won again to change them.

Marking a bid Lost
  1. Click the status of the bid › Lost.
  2. Pick a reason from the list (Price, Schedule, Scope or specs, GC used their usual sub, Project cancelled, No answer from the GC, Other) or type your own.
  3. Type who got the job and their price if you know them, and a note.
  4. Press Mark as Lost.
TipRecording the reason every time shows you over a year whether you lose more on price, on schedule or on scope.
Change Order status

Open the Change Order rows with the dots, then click a Change Order's status: Draft, Submitted, Accepted or Denied.

Bid follow-ups

Home › Bid follow-ups (Sales group) lists every Sent bid with its next follow-up: the 1st on day 7, the 2nd on day 14 and the 3rd on day 30 after the day it was first sent. At 45 days with no answer the bid is Going cold. Each salesman's follow-ups are also on their ☀ My day. Won, Lost or On hold takes the bid off the list.

  1. Press Follow up ▸ on a line (here or on My day).
  2. Pick How: Email, Call or Site visit. For an email, BidWise writes it from your template with the project, amount, sent date and GC contact filled in.
  3. Press Send and log it (sends from BidWise with Settings › Email), or Copy text / Open in Outlook to send it from there. A call or a visit is just logged.
  4. The bid moves to Follow-up and its next follow-up is booked. Won / Lost… in the same window closes it out.

Snooze moves one follow-up to a later day. When a bid goes cold, BidWise asks What happened? once: still open, Lost, Won, On hold, or stop following up.

Home › Bid follow-ups: every Sent bid in the order its follow-up is due.
Home › Bid follow-ups: every Sent bid in the order its follow-up is due.
Follow up: the email is written from the template; send it, copy it or open it in Outlook.
Follow up: the email is written from the template; send it, copy it or open it in Outlook.

⚙ Follow-up settings: the days for the 1st, 2nd and 3rd follow-up and how each is done (Email or Call), the days before a bid goes cold, Skip bids under $, the three email templates ({first} {project} {amount} {sent} {gc} {me}), bid due reminders for Drafts (2 days before the bid date) and whether follow-ups go on each salesman's My day.

Follow-up settings: days, how, going cold and the three email templates.
Follow-up settings: days, how, going cold and the three email templates.
Good to knowFollow-ups this month on top counts every follow-up logged this month, including bids that were Won, Lost or put On hold afterwards.
CFE BidWise Business

The Master user sees every salesman's bids (with a chip per salesman); a salesman sees only their own. Each PC shares its own bids with the team through Company data sync, and a Won or Lost picked on another PC is set on the bid by the PC that owns it.

Closed jobs

Bid Tracker › ✔ Closed jobs (also Home › Won jobs) lists every finished job: Job #, job name, GC, closed date, closed contract, and the Bid profit $ and % (from the Estimate Quote Recap) next to the Closed profit $ and % (after real costs and Change Orders). Chips find the jobs that closed better than bid or under bid.

Good to knowSalesmen see their own jobs here without needing Accounting.
Payments on Won bids
Record a payment
  1. On a Won bid press the green $ at the end of the row in the Bid Tracker (or Reports › Payments › + Record payment).
  2. Type the date received, the amount, how it was paid (check, cash, ACH / bank transfer, credit card) and the check or reference number. A note is optional.
  3. Press Record payment. The window shows the balance after this payment before you save.

Record each part payment as it comes in. No accounting program is needed: a printed proposal, a check or cash from the client is enough.

Paid and Balance columns

The Bid Tracker shows Paid and Balance next to the Award Amount on every Won bid. The balance is the award amount (or the proposal price when no award amount was entered) less the payments. When it reaches $0 the row shows ✓ Paid in full. Turn the columns on or off with Home › Columns.

Payment history, edit or delete
  1. Press the $ on the row › Payment history.
  2. ✎ Edit fixes a payment typed wrong; 🗑 Delete removes it after asking.
  3. Print prints the list for the client or the office.

Every payment recorded, changed or deleted is kept in the bid's history (File › Info), with who did it and when.

🧮Estimate Quote
Start a new estimate
  1. On the Dashboard press + Create New Estimate Quote, or press Ctrl + N anywhere.
  2. Fill in the header (see The header). The bid number comes from Settings › Defaults › Next bid number.
  3. Type the lines (see Line items).
  4. Press Ctrl + S to save v01. Once the bid number is set, the app also saves by itself every 30 seconds.
The header
Project and people

Project, Location, Salesman, Initials, Estimator and Callidus Estimator describe the job and who works on it.

GC and contact

Company, Contact, Phone No, Fax No and E-mail are the General Contractor you bid to. GCs you saved in Client Info are offered as you type.

TipBidding the same job to several GCs? Finish one, then use ⧉ Duplicate on the Dashboard and change the Company.
Dates and documents

Bid Due Date and Plan Date are typed as MM/DD/YYYY. Sections (spec sections such as 09 65 13), Addendums, Architect, Interior Designer and Job Start Date print on the proposals.

Job options

The Yes / No boxes set In-House or Subs labor, Prevailing Wage, Performance Bond, Tax Exempt and Furnish & Installed. Tax Exempt sets the tax to 0%. Performance Bond adds the bond % from Settings.

Line items
How a line works

Each row is one material. The white and yellow cells are yours to type in. The gray cells are formulas and are locked. The colored bands above the columns group them:

TAKEOFF AMOUNTSMaterial Description, Qty, Units, Attic % and Mat'l Qty (Qty plus attic stock).
LABORLabor $/u, Prep $/u, Labor Sub, Labor GP and Labor Total.
MATERIALMat'l $/u, Freight $/u, Prep Qty and Cost, Adhesive Qty and Cost, Mat'l Sub, Mat'l GP and Mat'l Total.
TOTALSLine Total = Mat'l Total + Labor Total.
Typing a line, step by step
  1. Material Description: the material, color and size, for example CPT-1 Carpet tile 24×24, Color 101.
  2. Qty: the gross amount from your takeoff.
  3. Units: pick SY, SF, LF, EA, M2… from the list.
  4. Attic %: extra stock the specs ask for, for example 2%. Mat'l Qty adds it.
  5. Labor $/u and Prep $/u: your installation and prep price per unit.
  6. Labor GP: the gross profit % on labor.
  7. Mat'l $/u and Freight $/u: your cost per unit.
  8. Prep Qty / Prep Cost $/u: bags of patch, leveler or primer and their price.
  9. Adh. Qty / Adh. Cost $/u: pails of adhesive and their price.
  10. Mat'l GP: the gross profit % on material. The totals fill in by themselves.
TipPress Enter to go to the next row. Enter on the last row adds a new row.
Adding, moving and deleting rows

Use Home › Line items: Insert row, Delete row, Move and Duplicate. Or right-click a row for Insert row above / below, Insert ↳ sub-line below, Duplicate row, Copy row, Cut row, Paste row, Move row up / down, Clear row and Delete row.

Deleting several rows at once

Drag down the # column (or click a row number, then Shift + click another; Ctrl + click adds more rows) and press Delete. A product row takes its ↳ sub-lines with it. Drag across cells instead and Delete clears just those cells; gray formula cells stay. Deleting 5 or more filled rows asks first, and Ctrl + Z brings back the last change.

Sub-lines (↳)

A sub-line sits under its product line for the extras that go with it, such as grout, seam welding, nosing, flash cove or corners. Right-click the product line › Insert ↳ sub-line below. For a sub-line of a sub-line (cove stick and cap under the flash cove), right-click the sub-line › Insert   ↳ sub-line below: it sits one step further in.

Bold headings

To make a heading such as LEVEL 1 or ALTERNATE: RUBBER BASE, type it in Material Description and press Ctrl + B or Home › Bold. Press it again to undo. Bold prints too.

Paste from Excel
  1. In Excel select the cells (for example Description, Qty, Units) and press Ctrl + C.
  2. In the app click the first cell to fill, for example a Material Description.
  3. Press Ctrl + V. The rows fill the typing columns in order, skipping the gray formula columns, and new rows are added as needed.
The bottom of the sheet
Recap and Proposal Price

Under the lines the Recap adds Material Total, Labor Total, Sub-contractor(s), Additional/Misc, tax, bond, burden and contingency into the Sub Total Job Cost and the Proposal Price. Total with COs adds the Change Orders in use. In the Estimate Quote Recap box, Profit % and Total Profit are your own company's profit (labor, material and Additional/Misc); each sub-contractor picked gets its own Total Sub #1 Profit line under it.

Sub-contractors box

Type each sub's name, Quote Amount and profit %. Names you used before are offered. The amount, quote # and name also come from the Sub #1, #2… profiles (see Sub-contractors).

Additional / Misc

For fees, travel, disposal and other lump sums. A negative amount deducts and turns red.

Freight Amount and Project Man Days

The Freight Amount adds up the freight of every line. The Project Man Days box comes from the Project Man Days sheet.

Profit Breakdown

Shows the profit on labor, material and Additional/Misc, then a line for each sub-contractor (Sub #1 Profit, Sub #2 Profit, …) and the Total Profit, and checks that it matches the Recap.

Project Notes & Reminders

Click the box and type anything about the job: walk dates, questions, reminders. The notes print on the Work Orders.

Job number on a Won bid

Once a bid is Won, a JOB NUMBER field shows next to BID NUMBER. It starts from the format in Settings › Numbering and files › Job number (J-{bid} unless you change it; {yyyy}, {yy}, {initials} and {project} also work). Type a job's own number or name to change it, or clear it to go back to the format. The yellow box, the title bar, invoices and job pickers follow it.

Markup or Margin

Home › Markup / Margin switches how GP % is used:

MarginTotal = Cost ÷ (1 − GP %). 30% margin on $70 = $100.
MarkupTotal = Cost × (1 + GP %). 30% markup on $70 = $91.
Good to knowThe same GP % gives a lower price in Markup than in Margin.
Checks before you send
  1. Press Home › Checks.
  2. The window lists anything to check: a blank Project or Bid Due Date, lines without units, prices or GP %, and whether the Profit Breakdown matches the Recap.
  3. Fix each item and press Checks again until it says Checks passed.
View options
Net Area

View › Net Area adds a Net column. With a Net amount, labor is priced on the area actually installed (Labor $/u × Net) instead of the gross Qty, while material still uses the gross. Turn it off to price labor on Qty again.

Show or hide boxes

View › Show / Hide › Commission and Man days turn those boxes on or off. Costs and Profit hide the cost or profit columns, for example before you share your screen with a GC.

Zoom, Freeze, Gridlines, Page Break

Zoom from 50% to 200% (or Ctrl + mouse wheel; type a % in the box and press Enter). Freeze keeps the top rows in place while you scroll. Gridlines shows the cell lines. Page Break shows where each printed page ends.

Saving and versions
  1. Press Ctrl + S (or 💾 Save). Each save keeps a new version: v01, v02, v03…
  2. The app also saves by itself every 30 seconds once the estimate has a bid number (Settings › Defaults › Auto-save every).
  3. To go back: File › Info › Restore a version, pick the version and restore it. The version you have today stays in the history.
Good to knowFile › Info shows when the estimate was created and saved, its Bid ID, where the file is and the whole change history.
🔁Change Orders and Alternates
What they are

A Change Order (or Alternate) is a separate price for added or changed scope. It has its own lines, header dates and total, and its total joins the bid as Total with COs as soon as it has a line or an amount. An estimate can have up to 9.

Fill in a Change Order
  1. Click Change Order #1 in the left menu.
  2. Type its lines the same way as on the Estimate Quote.
  3. Header fields you leave blank use the Estimate Quote's values; type new ones when an addendum changes them.
  4. Save with Ctrl + S.
Add, copy, rename or remove
  1. Right-click a Change Order in the left menu.
  2. Duplicate adds a blank next Change Order; Duplicate (with all info) copies its lines, header, dates and notes.
  3. Rename… changes its name, for example Alternate #2. The ID follows the name: Change Order #1 → -CO-1, Alternate #5 → -ALT-5.
  4. Delete removes it from this estimate.
Change Order status

Set it on the Dashboard: click the dots after the bid number, then the Change Order's status (Draft, Submitted, Accepted, Denied).

📁Job Folder
What the Job Folder is

Every estimate has its own Job Folder for plans, specs, addendums, change orders, takeoffs and seaming diagrams, schedules, emails, the bid invite and photos. It is a real Windows folder (in Documents\CFE\Job Folders), one per bid. Open it with 📁 Job Folder under the yellow estimate box in the left menu, or the 📎 count in the Bid Tracker.

FoldersPlans, Specs, Addendums, Change Orders, Takeoff & seaming, Schedules, Emails / Bid Invite, Photos and Other. You can rename them or add your own in Settings › Job Folder.
Added by themselvesThe Callidus, Measure Square, RFMS Measure or FloorRight takeoff PDF when you import it, and the proposals you email. Turn this off in Settings › Job Folder.
Good to knowA new estimate always starts with its own empty Job Folder, even before its first save.
Add files
  1. Open the Job Folder and click the folder the file belongs in.
  2. Drop files on the page, press + Add files to pick them, or paste.
  3. A file over the size limit asks what to do: skip it, add only the pages you need (for example Division 09 of a spec manual), or raise the limit.

The limit is 15 MB a file unless you change it in Settings › Job Folder (15, 25, 50, 100, 250 MB or no limit). Program files (.exe, .bat and the like) are blocked.

Add emails from Outlook
  1. Drag the email from classic Outlook straight into the Job Folder.
  2. Or press ✉ Add email to pick a saved .msg / .eml file or paste the email text.
  3. The attachments are saved as their own files next to the email.
Good to knowBidWise asks Outlook only for the email you dragged. It never reads your mailbox.
TipIf an email will not drop: click it once in Outlook, then drag again. With the new Outlook, drag the email to the desktop first, then drop that file in the Job Folder.
Open, revise and find files

Click a file name (or double-click, or Open) to open the real file in its own program: Adobe, Word, Excel or Outlook. Changes you save there stay in the Job Folder. 👁 shows a quick look inside BidWise. Right-click a file for the rest.

RevisionsAdding a sheet with the same name makes it the newest Rev; the old one is marked Replaced.
Tags and notesMark files and add a note to each.
Duplicate checkThe same file added twice is caught.
Search inside filesFinds words inside PDFs, Word, Excel and emails, in this job or in all your jobs.
File listFilters on every column, chips, 10 / 25 / 50 per page, Print list, Print Preview, Save PDF and Export.
Addendums
  1. Put each addendum in the Addendums folder.
  2. Mark it Acknowledged.
  3. The proposals print ADDENDUMS: No. 1 (date), … by themselves.

Email PDF warns you when a newer addendum is not acknowledged yet.

Use the files in proposals, work orders and submittals
Email PDFTick Job Folder files to attach with the proposal, and keep a copy of the sent proposal in the Job Folder.
Work Order For InstallersTick the plans, seaming diagrams and schedule the crew needs, then Print job packet: the Pick Ticket (no prices) with those files behind it in one PDF.
Submittal Cover SheetTick the product data sheets, warranties and SDS, then Print submittal package: the cover sheet plus the files in one PDF.
Field Folder: files for the crew phones

PDFs and pictures put in the Field Folder, or sent from any folder with Send to field (ribbon or right-click; no copy is made), go to the crew phones booked on the job as page pictures. A newer revision replaces the old one. Each file shows 📲 once it is on the phones, or Sending….

What the crews send comes back by itself: photos into Photos, reports as printable pages into Field reports, and signed change orders into Change Orders. New items show as NEW · FIELD with an Updated by the field bar (Show only new / Mark all seen). See Field app (crew phones).

Recycle bin
CFE BidWise Personal

Deleted files wait in the Recycle bin for 30 days, then go for good. You can pick 7, 30 or 90 days in Settings › Job Folder.

CFE BidWise Business

Deleted files wait in the Recycle bin for 30 days. Only the Master user can delete a file for good.

Save or share the whole folder
CFE BidWise Personal

Save all as ZIP saves every file of the job in one zip file.

CFE BidWise Business

The Job Folder is shared with your team. Each file is locked with your company key in your company's own shared folder (the same one as the company copy of bids); nothing is kept on BidWise's servers. Each file shows who added it, Team activity lists who added, changed and deleted files, and the Master user sets the team's size limit. Save all stays locked, so job files cannot leave the company as a plain zip.

⏱Rates, man days and commission
Man Day Rates

How much one installer completes in one 8-hour man day for each labor item, at journeyman level. Count the whole day: bringing tools and material to the work area, staging, acclimating and cleanup.

  1. Open Man Day Rates from the left menu.
  2. Type the QTY per Man Day for each Labor Description and Unit.
  3. Click a row to see or edit it below the table.
  4. Import adds a company's set of rates.
Rate sheet for a sub
  1. From Man Day Rates open the Man Day Rate Sheet.
  2. Print it, or press Blank CSV for the sub. The sub fills in QTY per Man Day, signs and sends it back.
  3. Load their numbers with Import Man Day Rates.
Project Man Days

Man days per line and the crew-day total for the job. Pick the Labor Description of each line from the Man Day Rates list. The total shows in its own box on the Estimate Quote and feeds Labor Rates and the installer work order. Change Order man days are counted separately. Man Days on reports turns them on or off on every printout (Labor $ does not change).

Labor Rates

Your loaded hourly rates for in-house crews and subs (Regular, Overtime, Weekend, Double Time). Fill in only the yellow cells. It turns the job labor cost into payable man days on the Estimate Quote.

Sales Commission

The commission calculator for the salesman, with four systems: Point for Point, Per Overall Gross Profit, Shop Cut with Split Remainder and a Tier System. Pick the system your shop uses and the Salesman Percentage. Show the result on the Estimate Quote with View › Show / Hide › Commission.

Travel & Subsistence calculator

Under Calculator in the left menu. It works out travel pay for a crew: the loaded wage, drive time for each driver and passenger, quarter-hour rounding on prevailing wage jobs, and a hotel stay compared with driving every day. It does not need an open estimate.

  1. Fill in the yellow cells: crew, wages, miles and drive time, days and hotel.
  2. Read the totals for driving every day and for staying near the job.
  3. Save as my defaults keeps your numbers for next time; Reset goes back to them.
📄Proposals
The three proposals
Unit ListEach material with quantity, unit price and total.
L&MLabor and material shown separately for each line.
Lump SumOne bid amount with the scope, inclusions and exclusions.

Open them from Insert › Proposal or the left menu. They fill in from the Estimate Quote and Settings, and stay linked: change the estimate and the proposal follows.

Choose the text at the bottom
  1. Open a proposal.
  2. On the Insert tab tick the boxes to print: Terms and Conditions, Standard Exclusions, Qualifications, Special Provisions, Payment Schedule, Warranty, List of Sub-contractors, Notice to Proceed, Safety notes and your custom boxes.
  3. Click a text box on the page, then Insert › Order › Move up / Move down to change the order.
  4. The text itself comes from Settings › Proposal text.
Edit a proposal for this bid only
  1. Press Home › Edit Proposal and confirm. The page shows EDIT MODE and is unlinked from the Estimate Quote.
  2. Click anywhere on the page and type. Use Undo, Redo, Row above, Row below and Delete row.
  3. Press 💾 Save Modified. The app lists anything that now differs from the estimate.
  4. While you type, a dashed line shows where each printed page ends, and the page count (Page 1 of 2) matches the printout and the PDF.
  5. To go back to the estimate's numbers, press ↺ Reset to Estimate.
Good to knowChanges made on the proposal are not sent back to the Estimate Quote, and later estimate changes no longer reach a modified proposal until you Reset it.
Proposal title and number

Click the title at the top right to change it (30 characters or less). The proposal number follows the bid number.

Print, PDF and email

Print opens the preview, where you can pick Portrait or Landscape, then your printer. Print to PDF opens the preview and saves a PDF. Save PDF saves it straight away. Email PDF makes the PDF and attaches it to an email (see Files, printing and email).

📝Forms: RFI and Submittal
RFI Sheet
  1. Open RFI Sheet under Forms.
  2. Type the question to the architect or GC. The project details come from the estimate.
  3. When the answer comes back, type it in the response. An RFI with a response shows as Answered.
  4. New RFI adds another, or right-click RFI Sheet in the left menu › Duplicate to copy one as the next RFI #. Each RFI has its own item under Forms (RFI Sheet #001, #002…); Previous / Next also move between them; Delete RFI removes one.
  5. Edit RFI unlocks the whole page: the Edit tools on the ribbon (Undo, Redo, Row above / below, Delete row, Add / Delete column) and the small bar over the text (bold, italic, underline, cut, copy, paste) work as on the Unit List Proposal. Save Modified keeps that RFI as edited; Reset to Estimate rebuilds it.
Submittal Cover Sheet
  1. Open Submittal Cover Sheet under Forms.
  2. The table lists the estimate's materials with Type, Division Section, Specification Data and Warranty. Type over any cell.
  3. The Edit tools on the ribbon (Undo, Redo, Row above / below, Delete row, Add / Delete column) and the small bar over the cell you type in (bold, italic, underline, cut, copy, paste) work as on the Unit List Proposal; Add line adds one at the end and Refill from Estimate starts again from the estimate.
  4. New Submittal starts a blank one; right-click Submittal Cover Sheet in the left menu › Duplicate (or Duplicate on the ribbon) copies it with all its info as the next Submittal #, for example for a Change Order or Alternate. Each Submittal has its own item under Forms. Print it or email the PDF with your product data.
Submittal Labels (sample labels)
  1. Open Submittal Labels under Forms (or 🏷 Sample labels on the Submittal Cover Sheet). Pick the Submittal #: the list fills from that submittal's lines with tag, brand, product, color, size and spec section.
  2. Lines with a finish tag (CPT-1, LVT-1…) and their color rows start ticked; tick any other line that needs a sample. Set how many labels each with − / + (3 = architect, GC, your file). Fix a line with ✎ Edit: for this submittal, or this printout only. The table and the preview show 10, 25 or 50 a page.
  3. Pick the size: Small 1 × 2⅝ (Avery 5160 / 8160), Standard 2 × 4 (Avery 5163 / 8163) or Large 3⅓ × 4 with the architect's action box (Avery 5164 / 8164). For rough or dusty sample backs use the weatherproof 5520 / 5523 / 5524. Print at 100%, never Fit to page.
  4. Print… prints everything ticked, some sheets (from sheet 1 to 4) or only the lines you pick, and 1 or 2 of each for a reprint; ⎙ 1 on a line reprints just that one. Used part of a sheet? Pick Start at label.
  5. ⚙ What prints picks what goes on the label (logo, address, phone, license #, spec section, project, submittal #, action box) and the Printer nudge; Print alignment test on plain paper shows whether your printer needs it.
  6. ⇪ Export saves the labels as a CSV for BarTender, DYMO, Brother or Avery Design & Print. Ordering › Submittals › Labels lists every Won job's submittals, which still need labels and which are printed; Make labels opens one, and Export there saves every submittal in the table.
👷Sub-contractors
Sub #1, Sub #2… profiles

Each sub on a job has a profile under Sub Contractors in the left menu. The profile and its approval are saved in your sub list (every estimate shares them); the work lines and notes stay with this estimate. Quote #, Quote Amount and the name feed the Sub row on the Estimate Quote.

Add a sub to a job
  1. Open Sub #1.
  2. In Company pick a saved sub or type a new one.
  3. Fill in the contact, email, phone and license.
  4. Type the Quote # and Quote Amount, or upload their quote (next topic).
  5. Press Save profile. Save to sub list keeps a new sub for other jobs.
  6. Need another sub? Right-click Sub #1 in the left menu › Duplicate (adds Sub #2). Up to 20.
Upload a sub's quote
  1. On the sub's profile press Upload quote (PDF), or drop the PDF on the box.
  2. Type the Quote #, date, project and amount the app asks for.
  3. Press Update amount to send the Quote Amount to the estimate. Open quote shows the PDF again.
Sub approval and documents
  1. Open ▸ SUB APPROVAL on the profile.
  2. Tick each requirement when you receive it (package, agreement, W-9, license, insurance…) and type the dates, amounts and expiry dates.
  3. When every box is ticked the sub shows Approved. You can approve anyway; the notes then record who approved it and what was missing.
  4. Missing papers? Open ▸ EMAIL SUB-CONTRACTOR, press ↻ Insert missing items, then ✉ Review and send….
Good to knowOnly check boxes, dates and amounts are stored, never the documents. Never type Social Security or driver's license numbers. The list of requirements is set in Settings › Sub requirements.
📦Ordering and Work Orders
The Ordering tab

Ordering buys the material for your Won jobs. Ordering › Dashboard shows what needs attention, the deliveries this week and all the material on Won jobs. The tiles Not ordered yet, Late deliveries and Arriving this week each open their own page (also under Track on the ribbon). Job material shows one job's lines.

CFE BidWise Business

The Open POs tile lists every purchase order still open.

TipThe ✎ next to a material changes its description (color, style…) without touching the bid's quantity or $. A prep or adhesive line with a quantity but no product yet shows as “… product not picked yet” so it is not forgotten.
Material List

What to buy, where it is and what goes on the truck. The lines come from the Estimate Quote and each Change Order.

  1. Press Ordering › Material List. It opens the open estimate's Material List, or asks which job.
  2. Type the vendor, PO #, Expected and Date Arrived as you order. The Vendor cell has a ▾ picker of your approved vendors, grouped by category.
  3. Mark ordered sets Date Ordered to today. Clear dates clears the selected row's dates.
  4. The table at the bottom adds prep and adhesive into one line per product (Combined), to order once.
  5. Refresh brings in estimate changes; Excel exports it.
  6. Drag the bar on the last line of any table (Estimate Quote, Alternates, Change Orders, Extra material) to make it taller or shorter, in Per line and Combined. Double-click the bar to fit it to the window again.

Ordered Qty and Actual $/u stay blank until a line is ordered; point at the cell to see the bid quantity and price. What you type on the open estimate's Material List shows on the Ordering screens right away, before you save.

Where the PO # comes from: point at a PO # cell and press its ▾. Pick Next BidWise number (BidWise counts up, so a number is never used twice; set the prefix and start in Ordering › Order settings), a PO # already on this job (to put another line on the same PO), or + Make a purchase order for this line (Business) / ✔ Mark this line ordered (Personal). Or type your own number from QuickBooks or the vendor.

A PO # on a line has a small ↗. It opens that purchase order when BidWise made it, or the PO list searched for that PO # (Ordering › Purchase orders on Business, Accounting › POs on Personal). Nothing has to be added to the PO list first.

Vendor late? In Ordering, a line's ⋯ menu › ⏳ Back-ordered (new date) sets the new date. The Material List shows it in Expected with ⏳ (the first date is in the tip). Typing another date in that cell replaces it.

Good to knowThe Material List used to be in the left menu; it is now on the Ordering tab.
Mark ordered

On any material line press ✔ Mark ordered and type the vendor, PO #, the expected date and the quantity. Ordering then shows it as Ordered until it arrives.

CFE BidWise Business

Instead of Mark ordered you can make a + Purchase order: pick the lines, the vendor and the dates, then Print, Save PDF or Email PO to vendor. Purchasing › Purchase orders lists them all, including the PO #s typed on each job's Material List (grouped by PO #). Click a PO to see its lines (material, qty, $/u, freight, ordered, expected, arrived and status) with Print and Export; ✎ Change / add to this PO adds more from the same vendor, changes a qty or price, or takes off a line that has not arrived. A PO that adds up below zero shows as ↩ Credit / return. Mark ordered on Business also keeps the date ordered and the actual $/u.

Order the whole job

Order whole job (on the Material List ribbon, or on a job in Jobs by date) orders everything still to order on the job, grouped by vendor, with the prep and adhesive that go with each flooring.

CFE BidWise Personal

Each vendor's lines are marked ordered at once.

CFE BidWise Business

It makes one purchase order per vendor. Warehouse › Receive shows the whole PO as one delivery.

What now? on late and missing material

Every line under Ordering › Dashboard › Needs attention (and every delivery card) has What now?, or click the line. It shows the job, PO, quantity, expected and install dates and the vendor's order desk, rep, phone and email, with the next steps: I talked to the vendor, Email the vendor, It arrived, Part of it arrived, Order it from another vendor, Move the install, Open the Material List or PO, Remind me later, Handled.

I talked to the vendor saves what they said (new date, shipped, back-ordered or arrived) with a note. The line stops being late and the call is kept in Order reminders › History; if the new date passes too, it comes back. Late deliveries also show in a red Still not here row on top of the delivery calendars.

Price Check: what you paid before

Ordering › Price check keeps one line per product with the last price paid, the vendor, job and date, and the change from the time before. Use the Type chips (type a new type to add it), search, price history, ✎ Fix the name, Remove and + Add a price.

Use this price on new estimates: a new estimate line with that product then starts from what you paid. Order settings › Price check database sets how long prices are kept (3 to 24 months, or all) and where they come from.

CFE BidWise Business

A Price went up chip and tile, alerts on the Ordering dashboard, and Who sees it (everyone on the team, or the Master user only).

Jobs by date

Ordering › Jobs by date lists every Won job in order of its install start, most urgent first. Use Set install date, the Installing in 2 weeks chip, open a job in place, or Order whole job. BidWise remembers the view you used last.

Order more for a Won job
  1. Short on material? Press + Order more on the Ordering ribbon, on a line's ⋯ menu or on Job material (or Extra material on the Material List).
  2. Pick the material, even one that was not on the bid, the quantity and the reason (Short on site, Stolen / missing from the job site, Damaged, More waste than bid…). A rush or expedited delivery fee can go in its own box.
  3. Order it like any line.

The extra is its own line under the line it is more of, with its own vendor, PO #, dates and who ordered it. Its whole cost, rush fee included, counts as your cost on the job (Material actual, closeout, WIP and the vendor's bill). Nothing is billed to the GC; for that, make a change order.

Change an order

Change this order… asks whether you are fixing a typo or ordering more. Raising the quantity offers Order N more, so the first order is never overwritten.

Deduct change orders: credits and returns

A change order that takes material out of the job (a deduct) shows its material line in Ordering and on the Material List as ↩ Credit · what happens?. Click it, or use the line's ⋯ menu, and choose:

Return it to the vendor for creditType the quantity, the vendor and a restocking fee %. The credit (what you paid, less the fee) and the return freight go on Job costs.
Keep it in Warehouse stockThe material goes on the shelf as stock and the job is credited.
Leave it with the ownerNothing to send back.

You can change or undo the choice any time. For a return, the ⋯ menu has 🚚 Return shipping (pallets or boxes, weight, class, carrier, PRO #, pickup date, addresses and freight terms), ⎙ Print return labels (one per pallet or box, n of N, with a big RMA # and a QR code for the vendor's scanner), ⎙ Print bill of lading for the carrier and ✓ Vendor credit received. When the carrier's bill or the vendor's real credit is different from the estimate, type it there and Job costs are fixed.

CFE BidWise Business

A return makes a return PO on the vendor: the vendor's credit less the restocking fee. It shows as ↩ Credit / return on Purchase orders, and Accounting › Bring in takes it off the vendor's bills as a vendor credit.

TipThe GC side is on Invoicing › Credit memos for deduct change orders, and the sub side on Accounting › Bills.
Order reminders

The red count on the Ordering tab is your order reminders: overdue, today and this week. Snooze one, mark it handled or see the history.

CFE BidWise Personal

CFE BidWise Personal has 4 simple reminder rules.

CFE BidWise Business

Every reminder rule can be changed, and reminders still late after a few days can go to the Master user.

Vendors, price check, submittals and team orders CFE BidWise Business

Purchasing on the Ordering ribbon holds Purchase orders, Vendors (links to Client Info › Vendors), Price check (what you paid per unit against the estimate) and Team orders (what each teammate ordered). Submittals tracks the submittals each job needs before ordering.

Ordering is done in another program

If your company orders in another program, Order settings has a switch that turns Ordering off. Turn back on brings it back.

Work Order for Installers

Scope, areas, quantities and the estimate's labor prices for the crew. Type the Area / Room for each line. The Pick Ticket prints what the installer picks up, without prices. Tick Job Folder files and press Print job packet to print them behind it.

Work Order for Office

Contract, billing and paperwork: the contract and Change Orders, a checklist (contract / PO received, insurance certificate sent, schedule of values, materials ordered, closeout) and material cost estimated against actual. Pick the Project Manager from your users.

Work Order for Warehouse

Bins, staged, loaded and delivered for each material, with PO and arrival dates from the Material List, plus extra items (sundries, tools, adhesives) not on the estimate. It is on Warehouse › Work order. The Warehouse Order prints the pull list.

🏬Warehouse
The Warehouse tab

Warehouse receives what you ordered and gets each job ready to go. The Dashboard shows today's schedule, late deliveries and problems, and a Pickups card for the next work day (with Print). Deliveries is the calendar of what is coming in.

ReceiveHow much came on each line and its condition (see Receive a delivery).
Pull & loadEach job's material, ticked off as it is staged, then Ready for pickup.
StockLeftover and stock material: add it, use it on a job, write it off.
CFE BidWise Business

Receive adds dye lots (with a mixed-lot warning), damage photos and the receiving slip. Pull & load has separate Pulled, Staged and Loaded steps, bins and the load sheet. Trucks, Bays & bins and Labels are on the ribbon. Stock adds use stock first, hold, move, sell and labels; Bring back returns leftovers and credits the job's costs; In stock now is a list for sales; and Sell on a new bid starts a new Estimate Quote with the stock as its first line at your cost.

Receive a delivery

Warehouse › Receive lists every delivery still on order, lined up by vendor, with filters (Late, Due today, This week, Back-ordered) and a search box. Each vendor shows its order desk phone.

  1. Open Warehouse › Receive.
  2. Find the delivery by vendor, PO, job or material, and press ✔ Receive on its row.
  3. On the delivery's page, set the date it arrived, who received it and where it went.
  4. Type the quantity that came on each line and its condition: Good, Partial (the rest stays back-ordered, with the date it is due) or Damaged.
  5. Press ✔ Save delivery.
CFE BidWise Business

Type the dye lot of each line (and split a line into two lots); a warning shows when two lots would go in the same area. Add photos of damage. Save + receiving slip also prints the slip.

Good to knowThe Material List's Date Arrived fills in by itself, and Ordering shows the line as Arrived or Partly arrived.
Deliveries list and delivery log

Warehouse › Deliveries is the calendar of what is coming in; late ones sit in the red Still not here row on top. ☰ List by day shows one line per delivery with Late, Today, This week, Next week, Back-ordered and Arrived filters, search, print and export.

⎙ Print delivery log prints the days on screen plus every late delivery, with Received, Time, Initials and Notes left blank, to post in the warehouse and fill in by hand.

Correct the amount on the shelf

Warehouse › Stock › ⋯ › Revise amount on hand: type the real amount on the shelf and why (shelf count, cut off for repairs, found more). The change is kept in History; 0 takes it off the shelf.

Labels for stock and jobs CFE BidWise Business

Warehouse › 🏷 Labels prints a label for each stock item on the shelves, with search, filters, ☐ Select (to print one or a few), Edit (a wrong color or lot #), ? How to and 10 / 25 / 50 per page. Job labels print by themselves when you press ✔ Save delivery on Receive (one per line and one per pallet), or from Pull & load › 🏷 Job labels. Nobody types a label.

Small 2 × 4 inBoxes and cartons on a shelf. Avery 5163 / 8163 (10 a sheet) or a 2×4 thermal roll. Start at label uses a half-used sheet.
Medium 4 × 6 inCarton stacks, rolls and pallets on the first level. 4×6 thermal labels, or Avery 8126 (2 per letter page).
Large pallet signFull pallets and the upper racks, read from the aisle floor: letter paper or Avery 5165. Print 2 copies, one for each side.
Custom (your size)Your own label printer or stickers. Press Custom size (or Warehouse › Settings › Labels › ✎ Set custom size) and pick an Avery sheet (5160, 5161, 5162, 5164, 5168), a label printer roll (2.25 × 1.25 to 5 × 3 in), or type the width and height (1 to 11 in). BidWise fits the label to it. Avery sheets print in the sheet's spots with Start at label; rolls print one label a page. Print a test first on very small sizes.

Every size shows which labels to buy. Every label prints Salesman: name · ask before selling. 🎨 Label colors gives each salesman, crew or client a color (a stripe, colored paper, or both). Warehouse › Settings › Labels sets the default size (Custom can be the default), the Medium paper, the QR code on or off, and whether job labels print at Receive.

Good to knowThe QR code holds only a BidWise code. The BidWise Field app (Warehouse) reads it to stage a job or look up stock. Any other phone opens a BidWise page that asks for the BidWise app and permission, and never sees the label's details.
Warehouse phones: stage jobs by scanning CFE BidWise Business

The warehouse people use the BidWise Field phone app too. They stage a job by scanning its job labels, scan any label to see what it is and whose it is, and count leftovers back into stock. The phones never show a price.

  1. The Master user opens Warehouse › Settings › Warehouse phones and turns it on.
  2. Press + Make the Warehouse code. On the phone, open the Field address shown there, type the code, your name and mobile number, and add it to the Home Screen.
  3. Approve the phone on Schedule › Field app.
  4. Optional: tick Installer crews that also do warehouse work. Their Field app gets a Warehouse tile (Stage jobs, Scan a label, Bring back).
StagePick the job and scan each job label (or tap the line). The phone beeps and says the item; a label from another job says Wrong job, and material not received yet is flagged. Pull & load ticks Staged with who and when, and the TV board shows Staging · 📲 name, then Ready – staged.
ScanAny stock label: ⇄ Moved it (another bay), 🔢 Count is off, or Use on a job.
Bring backLeftovers the crews reported, or pick the job: they go back into stock, the job's costs are credited, and new stock labels print at the warehouse PC.
Good to knowThe phones get the jobs and stock about once a minute while a BidWise PC is open.
In stock now: send it to sales CFE BidWise Business
  1. Open Warehouse › Stock and press ✉ Send "Available now" to sales.
  2. The Send to list has one person per line (name and email). Press Add at the bottom (Enter adds too) or Add from team. Each line has a Send tick, a Cost tick and a red Remove.
  3. Check the preview and send. It can also repeat every Monday or every weekday at 7 AM.

One Send goes out as two emails: the salesmen's copy without your cost, and a copy with your cost to the people with Cost ticked. The preview switches between the two.

Good to knowOnly emails at your company's own domain can be added (from Settings › Company or Settings › Email). Gmail and other free email addresses are refused.
Late deliveries

Under Today's schedule on the Warehouse Dashboard, late items are listed one per line, grouped by vendor, with the vendor's phone and a Call link.

  1. When a late item shows up in full, tick its box.
  2. Press Yes, it came. It is received in full today.
  3. For a partial or damaged delivery, use Receive instead. Open on Receive shows every late delivery there.
Adding warehouse staff CFE BidWise Business

Warehouse staff are team members of your CFE BidWise Business license. Warehouse › Warehouse users only marks who is "Warehouse only" (they see just the Warehouse tab, with no prices).

  1. The Master user opens About › License info and uses Add another team member (the + Add team member button on Warehouse users goes there).
  2. The new person installs BidWise and signs in on their own PC.
  3. Back on Warehouse › Warehouse users, tick Warehouse only next to their name.
  4. Under Who receives deliveries, press ✎ Edit and type the names of the crew, so Receive and Bring back can pick them.
Running a TV board on a TV CFE BidWise Business

The TV boards (CFE BidWise Business) show the job board (ready, staging, missing for today and tomorrow) and the deliveries coming in, on a TV in the warehouse. They refresh every minute and turn pages by themselves. A TV screen is free: up to 2 per company, no seat used, and it cannot open bids or show prices.

  1. On your PC (Master user): open About › License info › TV screens and press + Add a TV screen. Name it, pick 1 screen (Job board or Deliveries) or 2 screens (both, on two TVs), and press Get the TV code.
  2. Use any Windows PC in the warehouse (a small mini PC behind the TV works). Connect it to the TV with an HDMI cable and switch the TV's input to that HDMI port. For 2 screens, connect both TVs and pick Extend with Windows + P.
  3. Install BidWise on that PC (the same download as every PC). At the start screen press 📺 This PC is a warehouse TV and type the code. No account and no sign-in are needed.
  4. In TV setup, press Pick folder… and pick the company's shared folder on that PC (the same OneDrive, Google Drive, Dropbox, Box or server folder the office PCs use for the company copy). Set the text size and the seconds per page.
  5. Set a PIN (4 to 8 numbers). Only someone with the PIN can open TV setup or turn TV mode off.
  6. Press ▶ Start the board. From now on the PC goes straight to the board when it starts.
Where the board comes fromEvery CFE BidWise Business PC that uses the company folder sends its Won jobs there every 5 minutes, locked with your company's TV key and with every price taken out. Only your team PCs and your TVs can open it. The board never goes through BidWise's server.
⚙ on the boardAsks for the PIN, then opens TV setup (screens, folder, size, PIN, Leave TV mode).
Show screen numbersShows a big 1 and 2 on the TVs, so you know which is which.
Change or remove a TVOn your PC: About › License info › TV screens › Change, or ⋯ › New code (to move it to another PC) or Remove. The TV picks up the change within the hour.
TipTV setup has Keep the screen awake and Start the board when Windows starts, on by default. You can still show the boards on your own PC with Warehouse › TV board (⛶ Full screen, ✕ Exit).
📅Schedule and job notes
Book an install
  1. Open the Schedule tab (between Warehouse and Invoicing).
  2. Press + Book install, pick the Won job, the crew, the start date and the number of days. Starts at / Ends at times are optional.
  3. Save. The install shows on the calendar.

Installs run Monday to Friday. Turn on Saturdays are work days or Sundays are work days in Schedule settings for the whole company, or answer Work weekends on this install? on one install. Clicking a Saturday or Sunday on the calendar books that day with weekends on for that install.

With times, the same crew can do one job in the morning and another in the afternoon; the “crew booked twice” warning shows only when the hours overlap. The hours show on the calendar, in the job note and on the crew phones.

Each install shows whether its material has arrived and whether a change order is still pending. Print, Print Preview, Save PDF and Export are on the ribbon.

Material that will not be here in time: the Book install window lists, line by line, the material that will not be here by the first day (not ordered, no delivery date, back-ordered, or past its date) and offers Use <day>, the first work day after everything is in. A line whose delivery date already passed is called late, not “due before” the install.

Book an install: the real days it runs, the next open crews
Book an install: the real days it runs, the next open crews, and the material lines that will not be here by the first day.
CFE BidWise Personal

CFE BidWise Personal has the Month view with one crew.

Week by crew, crews and problems CFE BidWise Business

Week by crew shows each crew's week. Crews keeps your crews. Problems lists installs that are not ready and Won jobs with no install booked.

Day, Timeline and Agenda views

The View group on the Schedule ribbon has more ways to see the same installs: Day (one day hour by hour, one column per crew), Timeline (every job as a bar across the weeks, one row per crew, so you see who is free) and Agenda (a day-by-day list you can search, filter, print and export). Click a date on Month, Week by crew or Timeline to open that day.

👁 View options (Setup group) is your own choice on your PC: which view the Schedule tab opens on, which crews show, finished installs and notes on or off, the Day view hours and how many weeks the Timeline shows.

CFE BidWise Personal

On CFE BidWise Personal the Day view has one column and the Timeline has one row per job.

Day notes (reminders on a calendar day)
  1. Press 📌 Day note on the Schedule ribbon, or point at a day on the Month and click 📌+.
  2. Type the note, pick the day, an optional time and a color.
  3. Pick Repeat for a note that comes back every week, month or year (a Monday crew meeting, a pay app due every 20th).
  4. Tick ☀ Remind me to put it on My day that morning.

Notes show on the Month, on the Day notes row of Week by crew, on top of the Day view, in the Agenda and as 📌 on the Timeline. Click a note to change it, tick it done or delete it; on a repeating note Done ticks only that day.

CFE BidWise Business

Who sees it: everyone on the team or just you. Tick 📱 Show on the crew phones (for every crew or one crew) and it shows on that day in BidWise Field.

Availability: who is free next

🟩 Availability (Schedule ribbon, View group) shows every crew across 2 to 12 weeks: green is free, the crew color is booked, half green is part of the day booked, grey stripes are a day off, yellow is a holiday and a dashed amber box is a hold. Each crew shows how many free work days it has left and its next free day. Click a green day to book that crew there.

  1. Type how many work days the job needs in Who is free next? and press Find.
  2. Each crew's next open run lights up with a dark green border, skipping weekends, days off and holidays. The earliest crew shows on top with Book it.
  3. Press Book it (or Book on any crew). The install window opens with the crew, first day and work days filled in.

In + Book install the blue line shows the real first and last day, the work days, the hours each day and what the install skips. Next open days under it lists each crew's first free stretch, earliest first; Use picks one. Give the install a Starts at and Ends at time and the hours show on the board as part of the day.

CFE BidWise Business

Tick the trades a crew installs in Crews (Carpet, Carpet tile, LVT / LVP, Sheet vinyl, VCT, Rubber, Tile & stone, Wood, Base & walk-off, Floor prep). Pick a Trade in Who is free next? or in Book install and only the crews that do it show.

Schedule › Crews › ✎: tick the trades this crew installs.
Schedule › Crews › ✎: tick the trades this crew installs.
Schedule › Availability: every crew across the weeks, with booked days, days off
Schedule › Availability: every crew across the weeks, with booked days, days off, holidays and holds.
Who is free next? for an 8-day job
Who is free next? for an 8-day job: each crew's next open stretch lights up, with Book it on the earliest.
CFE BidWise Personal

On CFE BidWise Personal the board has one row for your crew.

Days off, holidays and holds
  1. Press ⛔ Day off on the Schedule ribbon.
  2. Pick What: Off (a crew is not working), Holiday (the company is closed) or Hold (days kept for a job that is not booked yet).
  3. Pick the first and last day and type a note. The note shows on the schedule.

An install skips days off and holidays like a weekend, so its last day moves later. If the days fall on a booked install the window names the job before you save. Held days can still be booked but are not offered as free.

Days off show on Availability, Month, Week by crew and Timeline. The list under the board has Print, Print Preview, Export, filters and search; click ✎ to change or delete one.

Day off, holiday or hold: a company holiday that moves two booked installs later.
Day off, holiday or hold: a company holiday that moves two booked installs later.
CFE BidWise Business

Who picks every crew (the company) or one crew. Schedule › Crews shows each crew's days off in the next 30 days.

Job notes and follow-ups

Each Won job has a timeline of notes, phone calls and site visits: Job notes (Schedule ribbon, or the Dashboard's Won jobs group) › + Add note. Give a note a follow-up date and it comes due under Follow-ups.

CFE BidWise Business

All notes lists the notes of every job, and a follow-up can be For a teammate.

📲Field app (crew phones)
My week and schedule changes on the phones

On the phone, Jobs › 📅 Week (or 📅 My week on Today) shows the crew's week, Monday to Sunday: the job each day, its hours and address, and the day notes the office sent. When the office books, moves or takes off one of the crew's jobs, the phone shows Your schedule changed the next time it opens. Got it shows here on Schedule › Field app as “Saw the schedule change”.

What the Field app is

CFE BidWise Field is the crew phone app. It is a web app (your license server address + /field) that works on any iPhone, Android phone or tablet and is added to the Home Screen; there is no app store. It keeps working with no signal and sends everything when the signal comes back. Crews see the jobs booked for them, rooms, material and the people on the job, never costs or bid totals.

CFE BidWise Personal

CFE BidWise Personal has one crew phone, with photos, extra work and GC sign-off.

CFE BidWise Business

CFE BidWise Business has up to 25 crew phones, one per Schedule crew, plus clock in and hours (to Job costs), room progress (to Job health), leftovers coming back to the warehouse, material requests, problems and the daily report.

Set up a crew phone
  1. The Master user opens Schedule › Field app and presses + Add a crew phone. On Business, pick the crew from your Schedule crews.
  2. Give the crew the crew code (it shows large, with a QR code and how-to steps).
  3. On the phone, the installer opens the Field address, types the code, their name and mobile number. The phone shows Waiting for your office.
  4. Back on Schedule › Field app, the waiting phone is at the top with its name, number and whether that number is on file. Press Approve (or Turn away). Any team member can approve.
Good to knowA PC checks for waiting phones every minute and shows a note when one is waiting. Each user types their own mobile and email for the crews on Schedule › Field app.
What the crews can do
JobsJob number in a yellow tag, dates, work hours, address with Directions, Materials, Contacts and From the office.
TodayThe job going on now, the day's checklist (set on Schedule › Field app › Checklists) and any other job that day.
PlansThe job's plans from the Field Folder, with pins and a punch list.
ChecksMoisture tests with readings and probe marks, material check (dye lots, shorts, damage), wait / delay log, safety talk.
PhotosGo to Job Folder › Photos by themselves, named with the date, room, tag and crew.
Change orders and job doneSigned by the GC on the phone.
Job walksBids still bidding (shown with the Estimate Quote number in green). Their plans leave the phones after 30 days unless the bid is won.
GC sign-off on the phone

The crew hands the phone to the GC's super, who signs extra work tickets and change orders with a finger. A signed change order turns Approved (a refused one Rejected), and a signed copy with the drawn signature goes to Job Folder › Change Orders. The GC can get an email copy. A change order request from the crew comes in as a Draft CO.

New from the field

What comes in from the phones shows as 📲 N new on the Dashboard and ↳ Field ● N new under the Job Folder in the left menu. Moisture over the limit, shorts, waits, plan notes and job done also become job notes. The job's Estimator / PM gets one email per crew visit, 10 minutes after the crew stops sending (on by default, on Schedule › Field app).

TipA job note of the kind For the crew phones shows on the phone's job page.
🧾Invoicing
What Invoicing does

Invoicing bills your Won jobs. Invoice lines come from the bid at sell prices: the base bid, accepted alternates and approved change orders. Each invoice has its own number, terms, PDF, print and email.

CFE BidWise Personal

CFE BidWise Personal has the short invoice form: full amount, a deposit % or a custom amount.

CFE BidWise Business

CFE BidWise Business adds progress billing by line (% complete), the billing period and salesman on the invoice, retainage held and released, pay applications, Receivables aging, GC statements and automatic reminders.

Make an invoice
  1. Press Invoicing › + New invoice. It opens its own page with two tables: ① new jobs not invoiced yet, and ② jobs with something left to bill.
  2. Find the job (search, filters, sorting, 10 / 25 / 50 per page) and press the kind of invoice you want: Deposit or Invoice.
  3. Check the lines and the amount, then Save, Print, Save PDF or ✉ Email.

⏰ Due to bill this month lists jobs whose install is booked or done and not billed since, and approved change orders waiting. The CO to bill and Not billed in 30+ days chips find the rest. The page remembers its chips, filters and search.

CFE BidWise Business

The tables also offer Pay app #1 and the next pay app, a Pay app due this month list, and ☑ Invoice selected: tick jobs in any table and make a draft for each one at once (the full amount left, or a deposit %).

Collect & bill

Collect & bill on Invoicing › Invoices says who owes you late money and which jobs you forgot to bill.

Owed to usLate, short-paid, promised, disputed, and due in the next 10 days.
Invoices we should have sentThis month's pay app not sent by the GC's day, and finished jobs whose retainage is not billed.

Every line has What now?: call, reminder, statement, promised date, record payment, disputed, lien rights, hand to the owner, or pause. I talked to the GC keeps what they said; a promised date keeps reminders quiet until then, and a missed one shows promise broken. A red count on the Invoicing tab and a morning pop-up remind you. The Invoices list has a search box and a Promised to pay column.

CFE BidWise Business

A 7 AM email from the Master PC sums it up for the owner.

Ready to bill

Invoicing › Ready to bill is a full screen of Won jobs with something to bill, with GC and Salesman filters, a Date awarded filter, search, pages and print. The icon of the screen you are on lights up in darker green.

Email an invoice
  1. Open the invoice and press ✉ Email.
  2. The card shows who it goes to, the subject, your typed Message and which email look it uses. Press Preview the email to see exactly what the GC receives.
  3. Send. The invoice PDF is attached.
ClassicA plain letter with the PDF attached.
BrandedYour logo inside the email, an amount box and the Pay Now button.
Modern summaryAlso a job progress bar and the billing history.

Pick the look in Invoicing › Invoice settings › Email look. It goes out through the email set up in Settings › Email (Microsoft 365 / Outlook.com, Gmail or other SMTP email), with a plain-text copy for mail programs that only show text.

CFE BidWise Business

Tick CC the salesman in Invoice settings to copy the job's salesman.

Record a payment

Press $ Record payment on the Invoicing ribbon (or on the invoice) and type the date, amount, how it was paid and the check or reference number. Payments received lists every payment, together with Reports › Payments; nothing is counted twice.

Online payments (Pay Now)
  1. Open Settings › Online payments and press Connect Stripe.
  2. Sign in to your own Stripe account (or make one). The money goes straight to your company, not through BidWise.
  3. Optional: add a credit card fee (cards only, at most 3%).

From then on every invoice email and PDF has a Pay Now link. The GC pays by bank transfer (ACH) or card, and the payment is recorded on the invoice, the job and Reports › Payments by itself. Works on CFE BidWise Personal and CFE BidWise Business.

Change orders on Won jobs

Invoicing › Change orders lists every change order on each Won job, from the estimate or added here. Each moves Draft → Pending → Approved → Billed, or Rejected, and prints as a change order. Approved ones are ready to bill.

CFE BidWise Business

Business adds the Accepted stage (a verbal OK), the board view, the GC's CO number and who approved it.

Credit memos for deduct change orders

If a job was billed before a deduct change order took money off it, Invoicing › Invoices shows an amber ↩ deduct change order to credit banner. Press ↩ Credit memo to make a credit memo (CM-####) for the GC.

Apply the credit to the GC's next invoice, or pay it back as a refund. The Credit memos chip lists them, and each shows the credit still left.

CFE BidWise Business

With QuickBooks Online connected, the credit memo and any refund go to QuickBooks too.

Job billing

Invoicing › Job billing shows one job at a glance: contract, billed, paid, owed, retainage and left to bill, with a fill bar, every invoice (click a number to open it) and every payment received.

Progress billing and pay apps CFE BidWise Business
  1. Press Invoicing › Progress billing and pick the job.
  2. Type the % complete on each line. Retainage is held by itself.
  3. Press + Pay app #N for the next application.

The Pay app (G702 / G703 style) has the contract, approved change orders, completed to date, retainage and current payment due. Print, Save PDF or Email it; it prints with the company footer, Page n of N and Continued pages. ✎ Edit changes the wording on one application; Reset to the numbers undoes it.

Stored material (column F) CFE BidWise Business

Material delivered to the site or your warehouse but not installed yet can be billed on a progress invoice as Stored material (column F of the G703). On the progress invoice press + Stored material.

  1. Pick how it is priced: Bid price (what the GC pays for it, the default) or Cost.
  2. Type the material on hand for each line as of this application. The hint shows what Warehouse received for the job and is not installed yet; Put it on the first line uses it.
  3. Save. When the material is installed, bill it as % complete and lower the stored amount: each invoice bills only the change.

Total completed and stored to date is G = D + E + F. The final billing takes the stored material off. With QuickBooks Online connected, the stored material change goes over as its own invoice line.

A progress invoice with the Stored material (column F) line above the estimate lines.
A progress invoice with the Stored material (column F) line above the estimate lines.
Stored material: priced at bid price, with the Warehouse hint of what was received and not
Stored material: priced at bid price, with the Warehouse hint of what was received and not installed.
GC approval and short pays CFE BidWise Business

Each pay app has a GC approval box. Once the invoice is sent, press ✓ Sent to the GC… and keep where it is: sent (through Email, Textura, Procore or GCPay), approved, or approved for less, with the amount the GC certified, the date and a note (what they cut, what to fix). Job billing shows GC and Waiver columns for every application.

When the GC certifies less, the tick Bill the difference on the next application (on by default) adds a line to the next progress or final invoice: “Not certified on application #n, billed again”. Once that invoice is sent, the same amount comes off the short-paid invoice, so the job is billed once: Job billing and the G702 (line 7, with a note on line 8) count it once.

Good to knowWith QuickBooks Online the carried amount goes over as a line on the new invoice, but the old invoice in QuickBooks still shows it open: credit it there.
Lien waivers CFE BidWise Business

On the pay app press + Lien waiver and pick the kind: Conditional or Unconditional, on progress or final payment, the amount and the date it covers. Send the conditional one with the pay app; the unconditional one only after the payment cleared the bank.

In California, Texas, Arizona, Nevada, Utah, Georgia, Florida, Michigan, Mississippi, Missouri, Wyoming and Massachusetts the waiver is laid out as that state's statutory form, with the statute named; other states get the BidWise standard waiver. Check it against the current statute before signing. Each waiver is listed under its application; click it to print or save it as PDF. An unconditional final waiver ticks the closeout paper on Job Check.

Good to knowCanada has no lien waivers: holdback is released against a statutory declaration that everyone on the job was paid. Companies in Canada see + Statutory declaration instead.
Retainage, receivables, statements and reminders CFE BidWise Business
RetainageWhat each GC holds back, and the invoice that releases it. Each job has a Job done date and a 📅 Release date (blank = Job done + the days in Invoice settings › Retainage due, 60 by default). The When to bill column shows Bill now, Due in 30 days, Later, No date yet or Released.
ReceivablesWho owes money and how late (aging by GC), with the reminder log.
StatementsOne statement per GC of everything open.
RemindersAutomatic reminder emails on past-due invoices; pause them on one invoice.
Invoice settings and numbering

Invoicing › Invoice settings holds the invoice numbering and terms, the look of the invoice (title, remit to, footer, black & white), the email subject, message and look, and tax. Job number can be “Same as Settings” or its own format, and can show on invoices; a change asks you to tick I understand before it saves.

Team billing: who invoices, and Ready to bill

On CFE BidWise Business the people the Master user gives Invoicing (Integrate › Team › What they can open) bill every estimator's Won jobs, not only their own. Estimators don't invoice: in the Bid Tracker they press 📨 (or 📨 Ready to bill… in the Billing box under the job), pick what is ready (the job is done, a deposit, work done this period or an approved change order) and add a note. The job goes to Invoicing › Ready to bill on top, with a red count on the Invoicing tab; making the invoice marks it billed. Invoice settings › Who invoices picks who Ready to bill goes to (everyone with Invoicing, or one person) and whether teammates with Invoicing see every job's invoices or only the jobs sent to them. If nobody but the Master user has Invoicing, every job goes to the Master user. The estimator sees the job's invoiced, paid and open amounts read-only, and the invoices and payments are kept in their bid, so they go up to the company copy and travel with a handover. It all rides on Company data sync, locked in your company's own folder.

Continue your QuickBooks invoice numbers

Already invoicing in QuickBooks Online? With QuickBooks connected, Invoicing › Invoice settings › Numbering and terms shows ⟳ Continue from QuickBooks. BidWise reads your last QuickBooks invoice number (for example 373930), fills in the next one (373931) and offers to clear the INV- prefix so the numbers match. Press 💾 Save settings to keep it. Nothing is sent to QuickBooks. If you save a number QuickBooks already used, BidWise warns you and offers the next free one. Jobs sent from the QuickBooks Online tab as an Estimate or Invoice get QuickBooks' own next number.

Invoicing done in other software

If your company invoices in another program, turn on Invoice settings › Our company does its invoicing in other software. The Invoicing ribbon then shows only Invoice settings, Turn back on and Export my data, and reminders and Collect & bill stop. Nothing is deleted.

CFE BidWise Business

On CFE BidWise Business only the Master user can change this switch.

QuickBooks Online for invoices CFE BidWise Business

The Master user picks one place to make invoices (Settings › QuickBooks Online). In BidWise: each invoice is copied to QuickBooks with the same number, linked to the job's Estimate, and each payment is applied there once; payments recorded in QuickBooks come back to the BidWise invoice. In QuickBooks: the Invoicing tab shows the QuickBooks invoices read-only. There is a live sync and a sync log.

📒Accounting
The Accounting tab and its password

Accounting (right after Invoicing) keeps your bills and the reports your accountant asks for. It has its own password, different from your BidWise sign-in.

  1. After sign-in the setup window opens first. Until the password is set, the tab shows an orange dot.
  2. Type the new password twice and save the recovery key it shows.
  3. Forgot it? Use the recovery key, or a 6-digit code emailed to you.
Good to knowAccounting locks after 10 minutes without use (or press 🔒 Lock). 5 wrong tries lock it for 15 minutes. Every change is in the Accounting activity log.
CFE BidWise Business

On CFE BidWise Business only the Master user opens Accounting. The Master can give someone else access until a date, and can be emailed when someone is locked out.

Bills

Accounting › Bills lists what you owe: Vendors, Subs and All bills tabs, one row per name with aging. Click an amount to open that vendor or sub, by job, bill and payment.

  1. Press + Enter a bill, pick the vendor or sub, the job, the date, due date and amount.
  2. Pay it in part or in full, or put it on hold.
  3. Bring in makes bills from your purchase orders, the PO #s typed on Material Lists, extra material, rush fees, return freight and job costs. Each bill keeps Our PO #, so bills match their POs.

Deduct change orders: when an Accepted change order takes installation labor off a job, Bills shows a ↩ … lowers what a sub is paid banner. Press ↩ Sub credit… to give it to the sub who installs it (it comes off their next bill, or they pay it back), or Our own crew when no sub is involved. Material returned to a vendor comes in as a vendor credit and is taken off that vendor's bills the same way.

CFE BidWise Business

Sub bills can hold retainage. Each bill shows Owed now (what you can pay today) and Retainage held on their own, so the bill list, the tiles, By job and My day show the same amount owed. Bills and bill payments go to QuickBooks Online, and payments made in QuickBooks (by hand, Bill Pay or bank feed) come back every 5 minutes or with Refresh now. A bill changed in QuickBooks shows a compare window: Keep BidWise or Use QuickBooks amount.

Reports for your accountant
Year & quarterInvoiced, collected, sales tax and what was paid out, for the year or one quarter.
ExpensesBy type, by vendor and by job.
1099 subsWhat each sub was paid in the calendar year, and who needs a 1099-NEC: $600 or more through 2025, $2,000 or more from 2026. Material vendors, corporations and your own W-2 employees are left off. You can change both amounts in Accounting › Settings.
Sales taxBy quarter.
Cash coming inOpen invoices and bills by due date, week by week.
CFE BidWise Business
BalancesWhat is owed to you and by you on any date.
Closed jobsThe schedule of closed jobs.
Close quarterLocks the quarter's bills and bill payments.
Insurance auditWhat each sub was paid, with their insurance (COI and workers comp) dates, for the insurance audit.
Lien rightsPreliminary notice and lien deadlines, and waivers.
Cash forecast13 weeks, with an estimated bank balance.
In-House Pay (your installers' pay)

Accounting › In-House Pay keeps what your own installers are paid, behind the Accounting password. For each installer: the Standard and Prevailing pay rate $/hr (yellow boxes) and the Burden % (taxes, workers comp, benefits). The switch on the Installers · pay row shows the Standard wage columns (light blue), the Prevailing wage columns (light green) or Both side by side. Each side works out the loaded $/hr for Regular, Overtime, Weekend and Double time (pay × multiplier + burden, for example $44 × 1.5 at 34% = $88.44) and One day (8 hrs), as you type. The multipliers (1, 1.5, 1.5 and 2 to start) are set in the two cards on top, one set for Standard and one for Prevailing, like Labor Rates; Job costs pays overtime hours at that overtime multiplier. With no Prevailing rate, an installer is paid the Standard rate on PW jobs (shown in grey). The crews table shows each crew's day, overtime hour, weekend day and double-time day for the wage picked. Print, Preview and Export are on the page. Installers with no pay rate yet are flagged; their crew days cost $0 in Job costs until it is set.

Job costs uses these rates for every crew day: the Regular rate, or the Prevailing rate on a job whose estimate says Prevailing Wage = Yes (Labor Rates › Labor Wage), the Regular one where no Prevailing rate is set. ⎙ Job labor budget picks a job and a crew and shows Standard and Prevailing side by side: bid man days ÷ crew size = crew days × one crew day = labor budget, against the labor the estimate priced, with the crew mix (journey-level to apprentice ratio).

Good to knowNames, crews, crew size and hours, T&M rates and each installer's Level (Foreman, Journeyman, or Apprentice with a %) stay in Settings › Installers, which no longer shows pay. Only the Master user can change pay; each change saves at once and goes in the Accounting activity log. Crew-day costs in Job costs and the labor $ on Rate check stay hidden until Accounting is unlocked.
Accounting › In-House Pay with Both side by side
Accounting › In-House Pay with Both side by side: Standard wage in blue, Prevailing wage in green (sample names and rates).
POs register

Accounting › 📦 POs lists every PO written (from Ordering and from Material List PO #s) with billed, paid, what you owe and what is not billed yet, links to the job, vendor and bills, and $ Pay on the line. On a vendor's page the PO #, material and job are links too.

Accounting done in other software

If you use other accounting software, turn on We do our accounting in other software in Accounting › Settings (or press We use other accounting software on the first password window). Accounting then asks for no password, shows no orange dot and stops reading QuickBooks bill payments. Turn it back on any time.

Accountant pack
  1. Press 📦 Accountant pack and pick the year with the period bar.
  2. Tick the reports.
  3. Press ⤓ Save Excel workbook to save it on this PC, or ✉ Email to my accountant (from your own email, Settings › Email).

The workbook opens on a Dashboard: pick the Year, Show (year, quarter or month) and Which in the yellow boxes, and the figures (Invoiced, Collected, Job costs, Gross profit, each against the period before), the charts and one job at a glance follow it. Page 2 has the A/R and A/P aging. A Contents page has your company details from Settings and a link to every report.

Every report is ready to print: no gridlines, fitted to the page width, your logo on top, headings repeated on every page with Continued…, and a footer with the company, the report, the date it was made and Page n of N. Totals are real Excel formulas.

CFE BidWise Personal

CFE BidWise Personal gets the simpler set of reports.

CFE BidWise Business

Reports include Job P&L by quarter, Job profitability, WIP, A/R and A/P aging (as of the period end), Invoices, Payments received, Bills and Expenses by type, Bill payments, Retainage, Balances on a date, 1099 or T5018 subs, Sales tax or GST/HST, and Closed jobs.

Good to knowNothing is kept on BidWise's server.
Subs, GCs and Vendors dashboards

Who we work with on the Accounting ribbon has a dashboard each for Subs, GCs and Vendors: tiles, a Needs your eye list, a donut chart, Coming up for the next 30 days (installs, bills due, deliveries, bids due, invoices due) and one table. Click a name for its own page.

SubsWhat you agreed with each sub (estimate sub lines and accepted change orders), billed, paid, owed now, not billed yet and still to pay.
GCsBids sent, won work, invoiced, paid to you, what they owe and past due.
VendorsOrdered, received, billed, paid, owed now, deliveries and back orders.

⎙ Print dashboard prints the donut and legend above the table.

CFE BidWise Business

Business adds the biggest-X bar charts, the GC bid pipeline, win rate and average days to pay, the GC grade A–D scorecard, comparing years and the Estimator filter.

Ask (Ctrl + K)

Press 🔍 Ask or Ctrl + K and type a question like “how much did we pay Elite Tile” or “what does Summit owe us”. The answer comes from your own numbers (no AI), with buttons to open that sub, GC or vendor.

🏗Client Info
What Client Info holds

The company database shared by every estimate: GCs, Subs, Vendors and Others (architects, owners). It is never saved inside a .cfe file. Open it from the Client Info tab.

Add a company
  1. Open Client Info › GCs (or Subs, Others).
  2. Press New.
  3. Type the company name, address, phone, website and, for GCs, where bid invites come from, payment terms and prequalification.
  4. Press Add contact for each person; Main contact stars the one estimates use.
  5. Press Save.
Tip⤓ Add GCs from my estimates creates GC records from the GC names already typed on your estimates.
Edit or delete

Click the company on the left, press Edit, change it and press Save. Delete removes it after asking. The page also lists the projects and quotes with this company.

Sub profile and paperwork

In Client Info › Subs, click the company name for the full Sub profile: info, contacts, the Sub Approval checklist (each requirement's paper, received, amount, expiry and status; + Add requirement or ✕ for that sub only), the Paperwork folder, quotes (Quote # opens the PDF), jobs and payments, notes, ✉ Email, 📁 Open folder and ⎙ Print. + New Sub-contractor opens the same page and stays Processing until every requirement is in.

Good to knowPaperwork is kept in Documents\CFE\Sub Folders and GC Folders. Once a day BidWise lists papers that expire within 30 days.
GC All about

In Client Info › GCs, click the name for All about: bids, win rate, won $, average days to pay, open balance and retainage, payment terms, bonding, billing / AP, the pay app form, their jobs and the GC's documents folder. The Our salesman column shows who in your company bids to that GC.

GCs we don't work with

Client Info › GCs › 🚫 Don't work with is your own list of GCs you don't bid to, with why (Not paying, Payment delays all the time, They shop our number, Back-charges, Unsafe site, or your own), since when, who added it and dated notes. Those GCs show in red with 🚫 in Client Info and on the Bid Tracker. Typing one on an estimate, or a bid invite from one, shows a Heads up: Bid anyway (say why) or Don't bid.

CFE BidWise Business

You can set that only the Master user can take a GC off the list.

Permanent IDs

Every company gets an ID that never changes, even if its name does: GC-0004, SUB-0007, OTH-0003, and every contact a CT- number. Each bid has one too, BID-CV-100001, shown on File › Info. The IDs let other programs, such as a CRM, match your records later. They are never printed on proposals.

Vendors

Client Info › Vendors keeps each vendor's profile: our account #, order desk phone, order email, fax, the sales rep's name, phone and email, terms, lead time, website or order portal, address / will call and notes. Each vendor has a category (Carpet & Underlayment, Hard Surfaces, Tile, Misc), with a tab per category and a Needs a category tab. The same vendor can be saved once per account, shown as “Shaw Contract · Hard Surfaces”.

Ordering, purchase orders and the Material List offer only Approved vendors. A vendor typed for the first time opens its profile first. Approving needs your account #; On hold and Not approved vendors cannot be ordered from.

CFE BidWise Personal

You approve your own vendors.

CFE BidWise Business

A teammate's new vendor waits as Pending approval until the Master user approves it (the order still goes through, with a note). Export for team saves the vendors in a locked .cfevendors file that opens only on your company's PCs; Import team file shows what is New, Changed or the Same before adding.

Import vendors from Excel or CSV

Already keep your vendors in a spreadsheet? Press Import vendors on Client Info › Vendors (or Data › Import Excel / CSV on the ribbon) and pick the .xlsx, .xlsm, .csv or tab-separated text file. Old .xls files must be saved as .xlsx in Excel first.

  1. Tabs and columns: BidWise reads every tab. The category comes from the tab name (Carpet & Pad, Hardsurface, Tile, Misc) or a Category column. The headings row is found by itself, even under a letterhead. Check that each column goes to the right box (Mill, Acct. No., Order Desk, Rep., Cellular, Order Fax, Misc. Info…) and change any that don't.
  2. Check the vendors: the list shows what is New, what Updates one in your list, an Extra rep, what is Already in your list, what Needs fixing, and the Lines not imported (titles, section names, repeated headings). The same mill listed once per rep becomes one vendor with Other reps. Change a category, fix a line with ✎ or untick it.
  3. Pick what to do with vendors already in your list: fill in only the empty boxes, use the file, or leave them as they are.
  4. Import. The last page shows the counts, with Undo this import to put your list back as it was.
Good to knowBad email addresses and lead times that are not a number go into the vendor's notes with a warning, and N/A account numbers are left empty. The import also works in BidWise Demo.
CFE BidWise Personal

You can approve the vendors as you import them; vendors with no account # stay Pending unless you tick also approve the ones with no account #.

CFE BidWise Business

The Master user can approve the vendors as they come in (vendors with no account # stay Pending unless also approve the ones with no account # is ticked). A teammate's import comes in as Pending approval.

Import and export a list

Client Info › Data › Import CSV adds companies from a spreadsheet; Export CSV saves yours for Excel.

📈Reports and printing
The Reports screen

Reports lists every printout by category: Estimate, Proposals, Forms, Ordering, Field & Office, Subs and Rates, plus the Bid Tracker, Billing, Job costs & WIP, Warehouse and Schedule & Notes. Pick a category on the left (or Jump to on the ribbon), then use the buttons on a report:

⎙ PrintOpens the preview (Portrait or Landscape), then prints on the printer you pick.
⤓ Print to PDFOpens the preview, then saves the PDF.
✉ EmailMakes the PDF and attaches it to an email.
⇪ ExportSaves a PDF, or an Excel or CSV file where the report has one.
CFE BidWise Personal

Reports that come with CFE BidWise Business show “Comes with CFE BidWise Business”.

What prints on every page

Your company letterhead and logo on the first page, a short header on the next pages, and a footer with page numbers. Set them in Settings › Company info.

Win / Loss report

Reports › Win / Loss puts every bid you marked Won or Lost in one place: the win rate, who gets the jobs you lose and why, and every won and lost bid with its award, PO and note.

The Won bids table also shows Paid and Balance with a totals line. Use the chips All, Open balance and Paid in full, the Period, Salesman and GC menus, and the filter boxes under each column. Click a Bid # to open the estimate.

Payments report

Reports › Payments lists every payment on your Won bids, newest first, with cards for Received this month, Received this year, Open balance and Paid in full.

Payments receivedDate, bid, project, GC, salesman, how it was paid, check or reference number, amount, who entered it and the note. Click a row to see that job's payment history.
Still owedEvery Won bid that still has a balance, with its award, paid, balance and last payment. Press + Record payment on a row to add one.

Both tables have filter boxes, Show 25 / 50 / 100 per page with page numbers, and a handle on the last line to drag the table taller or shorter.

Job costs and in-house crews CFE BidWise Business
Job costsReports › Job costs: every cost on a job (material, labor, crew days, subs, other), with budget alerts.
Job closeoutBid against actual for each finished job. Bid % is the Estimate Quote Recap's Profit %; Actual % is worked out the same way from what the job really cost, Change Orders included.
Extra work ticketsExtra work your in-house crews did, written up as a ticket that becomes a change order.
Job healthEvery job against its budget. A job going over shows At risk on the Bid Tracker.
Rate checkWhat your crews really install per day against your Man Day Rates.
Good to knowCrew-day costs use the pay rates in Accounting › In-House Pay (Prevailing on a Prevailing Wage job). The $ of each crew day, and the labor $ lost on Rate check, stay hidden until Accounting is unlocked; days and hours can still be entered.
WIP report CFE BidWise Business

Reports › WIP report shows each open job's contract, estimated cost, cost to date, % complete, earned, billed, over / under billing and profit fade. WIP settings lets you override a job's numbers.

Print one table only
  1. Press Print table or Print Preview at the right of a table.
  2. In Print Preview turn Edit on to leave rows or columns off (✕) or move rows with ▲ ▼ or by dragging; ↺ puts them back. The total counts only the printed rows.
  3. Pick Portrait or Landscape, then Print, Print to PDF, Save PDF or Email.
Good to knowEvery table print has a title, the company footer, Page n of N, See Next Page, and a Continued header with the column headings again on the next pages. Big amounts shrink the type so the table always fits the page.
💾Files, printing and email
Where your work is saved

Estimates are saved in your company database on this PC (in Documents\CFE Estimating). File › Info › Open file location opens the folder. A .cfe file is a copy of one estimate to send or keep elsewhere.

Open, Save As and Close

File › Open opens a saved estimate or a .cfe file. Save As saves a copy to a folder you choose. Close closes the estimate and asks to save changes.

Share and export
Email as PDFThe Estimate Quote or any proposal, all pages.
Email data file (.cfe)The other person imports it into the same fields.
Export · .cfeOpens in CFE BidWise on any PC.
Export · PDFThe Estimate Quote, ready to print or send.
Export · Excel / CSVOpens in Excel; imports back into the same fields.
Import
Import from Other Software

On the Dashboard, + Import from Other Software ▾ lists every takeoff program and file the app can read (Measure Square, RFMS Measure, your old workbooks, Excel or CSV) in one menu. Pick one and follow its steps below.

My line rules

Import Rules › My line rules are your own “when … then …” rules for takeoff imports. They run after the app's own rules, top to bottom, and you can turn each one on or off.

An estimate (.cfe, Excel, CSV)
  1. File › Import (or Integrate › Import › Data file).
  2. Pick the file from email or a folder.
  3. Check the preview and import it. It becomes a new estimate.
Old workbooks

Integrate › Import › Old workbooks reads the Excel estimating workbooks used before this app into new estimates.

Callidus takeoff
  1. Export the Summary Report from Callidus as a PDF.
  2. Press Integrate › Import › Callidus takeoff (or Import Callidus summary on the Dashboard), then Open PDF.
  3. Check the preview: every line gets a material type, and sub-lines (grout, seam welding, carpet padding, nosing, flash cove, corners) are added under their product. Lines marked yellow on the takeoff are flagged as revised; your notes go into Project Notes.
  4. Untick lines you do not want, or press Check all.
  5. Press Transfer to Estimate. Changed your mind? Undo transfer puts the sheet back.
Good to knowThe PDF is read on this PC by plain code and never uploaded. Attic % stays blank; type it on the Estimate Quote if you want it. Import Rules teaches the app your words and codes for next time.
Measure Square takeoff
  1. Print the Summary report from Measure Square to PDF.
  2. Press Integrate › Import › Measure Square (or File › Import › Measure Square takeoff), then Open PDF. The app tells a Measure Square report from a Callidus one by itself.
  3. Check the preview: Usage (waste included) is the Qty and Net Area is the Net. Grout, adhesive, setting material, waterproofing, crack isolation, floor protection, skim coat, sanding & patching and moisture tests that name one product go under it as sub-lines. Every line comes in ticked; lines marked |ALT are flagged so you can untick them.
  4. Job Site fills Project and Location, Customer fills the GC when it is empty, and the plan tabs and LOCATION notes go into Project Notes.
  5. Press Transfer to Estimate. Changed your mind? Undo transfer puts the sheet back.
RFMS Measure takeoff
  1. Save the takeoff report from RFMS Measure as a PDF (the page with Style: Color, Net Area and Gross Qty).
  2. Press Integrate › Import › RFMS Measure (or File › Import › RFMS Measure takeoff), then Open PDF. The app tells an RFMS Measure report from a Callidus or Measure Square one by itself.
  3. Check the preview: Gross Qty (waste included) is the Qty and Net Area is the Net. The code (CPT-1, LVT-01, RB-1 …) and the words on each line pick its type; transition strips (TS) are Transition / trim. Every line comes in ticked, except a No Material area.
  4. Job Site / Project Name fills Project, Customer fills the GC when it is empty, and the note under Terms and Conditions goes into Project Notes.
  5. Press Transfer to Estimate. Changed your mind? Undo transfer puts the sheet back.
FloorRight takeoff
  1. In FloorRight, print the Job Summary to PDF (Microsoft Print to PDF). Widen the Item name column or print landscape so long names are not cut short.
  2. Press Integrate › Import › FloorRight (or Dashboard › Import from Other Software › FloorRight), then Open PDF. The app tells a FloorRight Job Summary from the other programs by its Item name, Material qty. and Multiplied qty. columns.
  3. Check the preview: Multiplied qty. (waste included) is the Qty and Net Material Area is the Net. Pieces (pcs) come in as ea, feet and inches as lf. Grout, waterproofing and crack isolation rows under an item come in as its ↳ sub-lines.
  4. A name FloorRight cut short ("WALL TIL") is finished from flooring words and flagged. Lines named NONE come in unticked.
  5. Press Transfer to Estimate. Changed your mind? Undo transfer puts the sheet back.
Set up email (Email PDF)
  1. An Admin opens Settings › Email.
  2. Most offices: press Outlook / Microsoft 365 (also for Hotmail). Gmail: press Gmail / Google Workspace. Your browser opens the provider's own sign-in page; sign in and allow BidWise to send email.
  3. Other email (Yahoo, GoDaddy, your website's email): open Show server settings and type the server, port, user name and password your IT person or provider gives you.
  4. Press ✉ Send a test email to me and check your inbox.
Good to knowBidWise only sends email for you and never reads your inbox. Without email set up, Open in my email program opens a new Outlook message with the PDF attached; you press Send.
Back up and restore
  1. An Admin opens Settings › Save (Backup / restore).
  2. Pick Back up to cloud by: a synced folder (OneDrive, Google Drive, Dropbox, Box, iCloud) or a Google Drive folder link.
  3. Tick Back up automatically (once a day) and choose how many backups to keep.
  4. Press Save settings, then ⟳ Back up now.
  5. To restore: ⤒ Restore from backup…, pick the backup, then choose Settings only, One estimate or everything.
TipHelp Tip · how to set up cloud backup on that page walks through both options step by step.
Desktop and laptop sync

Sync lets you start an estimate on your desktop and finish it on your laptop. BidWise does not run its own cloud: it saves a copy of each estimate in a folder of the cloud service you already use (OneDrive, Google Drive or Dropbox), and that service carries the folder to your other computer.

🖥DesktopBidWise saves a copy of each estimate
⇄
☁Your cloud folderOneDrive, Google Drive or Dropbox
› CFE Estimating Sync › your username
⇄
💻Laptopbrings in new copies every 2 minutes
The cloud app carries the folder between your computers; BidWise reads and writes the copies in it.

It is set up once on each computer, in this order:

  1. Install and sign in to one cloud app on both computers, with the same account. Pick the topic for your service below: Set up OneDrive, Set up Google Drive or Set up Dropbox.
  2. On the first computer turn on sync in BidWise and pick that cloud folder (Pick the folder in BidWise).
  3. Tell the cloud app to keep the new CFE Estimating Sync folder on the computer, not only online.
  4. Do the same on the second computer (Your second computer).
  5. Save an estimate on one computer and see it arrive on the other (Check that it syncs).
Good to knowYour seat works on one computer at a time, so the same estimate is never changed in two places. The pictures in these topics are drawings of the screens; your version of Windows or of the cloud app may look a little different.
Which cloud service?

Any one of the three works. Use the one your company already pays for, or the one you already have an account with. Both computers must use the same service and the same account.

OneDriveBuilt into Windows 10 and 11, nothing to install. Free with a Microsoft account (5 GB) and included in Microsoft 365.
Google DriveInstall Google Drive for desktop. Free with a Google or Gmail account (15 GB, shared with Gmail).
DropboxInstall the Dropbox app. The free Basic plan (2 GB) allows 3 computers, enough for a desktop and a laptop.
TipEstimates are small files. Even a free plan holds thousands of them.
Set up OneDrive

OneDrive comes with Windows 10 and 11. You only need to sign in, on both computers, with the same Microsoft account (personal, or your work Microsoft 365 account).

  1. Click the OneDrive cloud ☁ at the bottom right of the taskbar, next to the clock. If you do not see it, click ˄ (Show hidden icons). No cloud at all? Press the Windows key, type OneDrive and open it.
  2. Press Sign in and type your Microsoft account email and password.
  3. On Your OneDrive folder keep the suggested place and press Next. It is C:\Users\your name\OneDrive (work accounts: OneDrive - Company name).
  4. Press Next through the welcome pages. When OneDrive offers to back up Desktop, Documents and Pictures you may say Not now; BidWise does not need it.
  5. Open File Explorer. OneDrive now shows on the left with a cloud icon, and the taskbar cloud says Your files are synced.
☁ OneDrive

Sign in to OneDrive to sync your files.

Sign in2
˄☁1🔊📶9:14 AM
10/30/2026
Click the OneDrive cloud ☁ by the clock (1), then Sign in (2).

After you turn on sync in BidWise (next topics), make the BidWise folder stay on the computer:

  1. In File Explorer open OneDrive.
  2. Right-click the CFE Estimating Sync folder › Always keep on this device.
  3. The Status column shows a solid green circle with a white check. A cloud ☁ means the files are online only.
File Explorer—  ☐  ✕
‹ › ↑  OneDrive ›
🏠 Home
☁ OneDrive1
🖥 This PC
🗂 Documents
NameStatusDate modified
📁 CFE Estimating Sync2☁10/30 9:14 AM
📁 Documents☁10/30 9:14 AM
📁 Pictures✓10/30 9:14 AM
Open
Open in new window

OneDrive›
Always keep on this device3
Free up space

Share
Properties
Open OneDrive (1), right-click CFE Estimating Sync (2) › Always keep on this device (3). Status: ✓ kept on this device, ✓ on this device for now, ☁ online only.
Good to knowIf the taskbar cloud shows a pause sign ⏸, click it › Resume syncing. A red ✕ means OneDrive needs you to sign in again.
Set up Google Drive

On Windows, Google Drive needs the free Google Drive for desktop app on both computers, signed in with the same Google account.

  1. Download Google Drive for desktop from google.com/drive/download and run GoogleDriveSetup.exe.
  2. When it opens your browser, sign in with your Google account and press Sign in / Allow.
  3. Google Drive now shows in File Explorer as a drive, usually Google Drive (G:), with My Drive inside. That My Drive folder is the one you pick in BidWise.
  4. Optional: click the Google Drive icon in the taskbar › ⚙ Settings › Preferences › Google Drive. Stream files (the usual choice) keeps files online until they are opened; Mirror files keeps a full copy in C:\Users\your name\My Drive. Both work; if you mirror, pick that folder in BidWise instead.
Download Google Drive for desktop ›
Google Drive for desktop · Preferences—  ☐  ✕
💻 My Computer
△ Google Drive1

My Drive syncing options

CancelSave
Taskbar Google Drive icon › ⚙ Settings › Preferences › Google Drive (1). Stream files (2) or Mirror files: both work with BidWise.

After you turn on sync in BidWise (with Stream files), make the BidWise folder available offline:

  1. In File Explorer open Google Drive (G:) › My Drive.
  2. Right-click CFE Estimating Sync › Offline access › Available offline. On Windows 11 look under Show more options first.
File Explorer—  ☐  ✕
‹ › ↑  Google Drive (G:) › My Drive
🏠 Home
🖥 This PC
△ Google Drive (G:)
   My Drive1
NameStatusDate modified
📁 CFE Estimating Sync2☁10/30 9:14 AM
📁 Bids 2026☁10/30 9:14 AM
Open
Copy link

Offline access3›
    ✓ Available offline
    Online only

Properties
Open My Drive on the G: drive (1), right-click CFE Estimating Sync (2) › Offline access (3) › Available offline.
Good to knowPick a folder inside My Drive. Do not use Shared with me or the Computers backups: they do not sync both ways.
Set up Dropbox

Install the Dropbox app on both computers and sign in with the same Dropbox account.

  1. Download Dropbox from dropbox.com/install and run the installer.
  2. Sign in with your Dropbox account.
  3. When Dropbox asks how to keep files, either choice works. Dropbox makes the folder C:\Users\your name\Dropbox and shows Dropbox on the left of File Explorer.
  4. The Dropbox icon in the taskbar shows a blue check ✓ when everything is up to date.
Download Dropbox ›

After you turn on sync in BidWise, keep the BidWise folder on the computer:

  1. In File Explorer open Dropbox.
  2. Right-click CFE Estimating Sync › Make available offline (older versions: Smart Sync › Local).
  3. The folder shows a solid green check.
File Explorer—  ☐  ✕
‹ › ↑  Dropbox
🏠 Home
◇ Dropbox1
🖥 This PC
NameStatusDate modified
📁 CFE Estimating Sync2☁10/30 9:14 AM
📁 Photos☁10/30 9:14 AM
Open

Share…
Copy Dropbox link
Make available offline3
Make online-only

Properties
Open Dropbox (1), right-click CFE Estimating Sync (2) › Make available offline (3).
TipTo make every new file local from now on: click the Dropbox icon in the taskbar › your picture or initials › Preferences › Sync and set new files to be available offline.
Pick the folder in BidWise

With the cloud app signed in, turn on sync on the first computer.

  1. Press Integrate › Set up sync (or Set up sync… on About › License info).
  2. Press Browse….
  3. In the window that opens, click the top cloud folder on the left: OneDrive, Google Drive (G:) › My Drive or Dropbox. Press Select Folder.
  4. The path shows in the yellow box, for example C:\Users\JSmith\OneDrive. Press Turn on sync.
  5. BidWise makes CFE Estimating Sync\your username in that folder and sends every estimate you have. The message Sync is on tells you how many.
  6. Now do the after step of your cloud topic: keep CFE Estimating Sync on this device.
Pick your OneDrive, Google Drive or Dropbox folder—  ☐  ✕
‹ › ↑  This PC › Local Disk (C:) › Users › JSmith
🏠 Home
☁ OneDrive1
△ Google Drive (G:)
◇ Dropbox
🖥 This PC
NameDate modified
📁 Documents10/28 4:02 PM
📁 Pictures10/12 8:40 AM
Folder: OneDriveSelect Folder2Cancel
After Browse…: click your cloud folder on the left (1) and press Select Folder (2). Then press Turn on sync in BidWise.
OneDriveC:\Users\your name\OneDrive
Google DriveG:\My Drive (or C:\Users\your name\My Drive when mirroring)
DropboxC:\Users\your name\Dropbox
Good to knowPick the cloud folder itself, not the CFE Estimating Sync folder inside it. It is not a web address: no https:// is needed.
Your second computer
  1. Set up the same cloud app with the same account (the topic for your service).
  2. Wait until CFE Estimating Sync shows in the cloud folder in File Explorer. It can take a few minutes after the first computer turned sync on.
  3. Sign in to BidWise with the same BidWise username as on the first computer. Each user syncs their own folder.
  4. Press Integrate › Set up sync › Browse…, pick the same cloud folder (the top folder, as on the first computer) and press Turn on sync.
  5. Do the after step: keep CFE Estimating Sync on this device.
TipYour seat works on one computer at a time. When you open BidWise on the other computer, it asks to move your seat there; the first computer switches to read-only.
Check that it syncs
  1. On the first computer open an estimate, change something small and Save.
  2. Wait until the cloud icon in the taskbar says it is up to date.
  3. On the second computer press Integrate › Sync now. The message Estimate … came in from your other computer shows, and the bid is on the Dashboard.

About › License info shows the sync card with ✓ On, the folder and the Last sync time. From now on you do nothing: every save goes to the folder, and the other computer checks for new estimates every 2 minutes.

Good to knowNot arriving? See Troubleshooting › Backup and sync › An estimate is not on my other computer.
⚙Settings
How Settings work

Settings are shared by every user of your company and only an Admin can change them. Your edits stay on screen until you press 💾 Save settings; the pill shows how many changes are unsaved. ↺ Revert all drops them. Every save is listed in Settings history with a Restore button.

Company info

Company name, DBA, address, phone, email, website, contact person, contractor license and classification, and the logo (JPG or BMP, max 500 KB). They print in every proposal and RFI header. You get a reminder 60 days before the license expires.

Company location: United States or Canada

The first card under Settings › Company info is Company location. United States is the default. Pick Canada and BidWise asks once, then uses Canadian names, forms and taxes for the whole company. Pick your Province, type your GST/HST number (it prints on proposals and invoices), your PST number and your WorkSafeBC (or WCB) account, then press 💾 Save settings. A red maple leaf next to your name on the title bar shows BidWise is running the Canadian setup. Built first for British Columbia; every other province gets its own GST, HST and PST rates.

Quebec is its own choice in the Province list. Invoices add GST 5% and QST 9.975% (both shown, and both go to QuickBooks as the GST/QST QC code), so type your QST number next to the GST number. QST you pay on materials comes back as input tax refunds, so it is not a cost. Employees get a T4 and an RL-1 (QPP, EI and QPIP), workers' comp is CNESST, and subs need an RBQ licence and a CNESST letter. Quebec has no holdback set by law (10% by contract is usual) and a legal hypothec must be registered within 30 days after the work ends. Pay Now cannot add a card fee in Quebec. The GST page splits what goes to the CRA and what goes to Revenu Québec.

SubsT5018 in place of the 1099: each sub paid $500 or more in a year for services, corporations included. Materials on a sub's bill stay off. Accounting › T5018 subs; file within 6 months after the year ends.
Your own installersT4 in place of the W-2: CPP, EI and income tax held back; WorkSafeBC on top.
Tax in the bidIn BC you pay 7% PST on the flooring you install (it becomes part of the building), so it goes into material cost and is not charged to the customer. Settings › Tax / Bond / Burden: PST, Municipal (leave blank if none), the total, and labour tax like the US version.
Tax on invoicesGST 5% (HST 13–15% in Ontario and the Atlantic provinces) goes on every invoice. Proposals say Plus 5% GST under the total. Accounting › GST / PST shows GST billed less GST paid on bills (input tax credits) by quarter.
HoldbackRetainage is called Holdback (10%). Accounting › Holdback & liens shows the 45-day lien deadline, when the holdback is due back (55 days) and jobs of $100,000 or more that need a holdback account.
Addresses and moneyState and Zip become Province and Postal code (A1A 1A1). Invoices show AMOUNT DUE CAD.
Pay Now and QuickBooksPay Now charges in CAD, by card (fee up to 2.4%) or Canadian bank debit. QuickBooks Online Canada gets your own GST / HST tax codes; set up GST/HST in QuickBooks › Taxes first.
Good to knowSaved bids, invoices and bills do not change when you switch. You can switch back any time. This is a guide to the forms, not tax advice: check the rates and days with your accountant.
In-House / Subs (important)

Under Company info, pick how your company pays its installers. In-House: your own installers, paid by your shop through payroll on a W-2 (no 1099). Subs: sub labor shops and installers paid on a 1099. Both: some jobs each way. It matters for taxes: subs show on Accounting › 1099 subs, W-2 crews never do. In-House or Subs fills In-House / Subs on every new Estimate Quote, so you do not have to pick it each time (you can still change it on one estimate). Both asks on each estimate.

Proposal text
  1. Click a box on the left: Terms and Conditions, Standard Exclusions, Qualifications…
  2. Type or paste the text. Paste as plain text and Clear formatting clean text copied from Word. Find / replace changes a word everywhere.
  3. Set On by default or Off by default for the Insert tab, and drag boxes to set the print order.
  4. + Add custom box adds your own.
  5. Press Save settings.
Good to knowNew proposals use the new text right away; proposals already saved keep the text they were saved with.
Defaults

Starting values for every new estimate: Labor and Material GP %, default units (including M2), how long proposals are valid, commission type, bond / burden / contingency, Sales, County and Municipal tax on materials, labor tax, VAT, the bid number format, the next bid number and how often to auto-save.

My Signature

Who the proposals are from. Pick a signature style and type the printed name, title and a line such as phone, email or license #. Someone else signs (the owner or CEO)? Type their name and title; leave it empty and each proposal is signed by the user who prints it.

Sub requirements

The check boxes of Sub Approval on every Sub profile. Add, remove or reword them; some can ask for an expiry date with a reminder 30 days before. ↺ Standard list puts back the standard eight.

Customize Ribbon (quick bar)
  1. Open Settings › Customize Ribbon (or click ⚙ on the quick bar).
  2. Click the tools you use most in the list on the left. They show as small icons at the top of the window.
  3. Change the order, and tick Show names under the icons if you like.
  4. ↺ Standard tools starts again.
Good to knowYour quick bar is yours: it is saved for your user right away and changes nothing for others.
Job number format

Settings › Numbering and files › Job number sets how Won jobs are numbered: J-{bid} unless you change it, with {yyyy}, {yy}, {initials} and {project} to build your own. Saving a new format asks you to confirm: every Won job without its own number follows it, and sent invoices keep theirs.

Job Folder settings

Settings › Job Folder: the file size limit (15, 25, 50, 100, 250 MB or no limit), where the folders are kept, the folder names, how long the Recycle bin keeps files, and whether imported takeoff summaries (Callidus, Measure Square, RFMS Measure, FloorRight), emailed proposals and bid invites are added by themselves.

Email, QuickBooks Online and online payments

Connections on the Settings ribbon: Email (Outlook / Microsoft 365, Gmail or other SMTP email, used for proposals, invoices and POs) and Online payments (Connect Stripe for Pay Now; see Invoicing › Online payments).

CFE BidWise Business

QuickBooks Online connects your company's QuickBooks and picks where invoices are made.

Export or import my data

Settings › Your data › Export my data saves your data as an Excel workbook, a zip of CSV files, a QuickBooks Desktop IIF file or JSON, for your accountant, another program or your own records. Import my data brings data in from a new PC's backup, a BidWise export file or another program's Excel, CSV or JSON, and skips what you already have.

CFE BidWise Business

Bids and estimate lines can be exported only by the Master user, so bids stay with the company.

Company data sync
CFE BidWise Personal

Settings › Backup / restore › Company data sync keeps your own PCs in step through your own cloud folder: GCs, subs and paperwork, vendors, Price Check, ordering, warehouse, invoicing, accounting and settings.

CFE BidWise Business

Settings › Backup / restore › Company data sync shares GCs, subs and paperwork, vendors, Price Check, ordering, warehouse, invoicing, accounting and company settings with the team through the company's shared folder, locked with the company key. The newest change wins and the older one is kept in History; changes made offline wait; Removed keeps deletions for 30 days. The status bar says Synced with the team.

Move settings to another PC

⤓ Export settings (.cfesettings) saves company info, logo, proposal text and defaults (no estimates or passwords). On the other PC press ⤒ Import settings…; you see a preview before anything is replaced.

👥License, team and computers
License info

About › License info shows your plan (CFE BidWise Personal or CFE BidWise Business), seats, renewal date and computers. ⟳ Refresh license checks it online; Enter new key… changes the key; Manage subscription opens your Stripe billing portal (sold through Link, a Stripe company) to change how often you are billed (every month, every 6 months or every 12 months), update your card, see your receipts or cancel. The same 1, 6 and 12 month choices are there for CFE BidWise Personal and CFE BidWise Business.

Switch from CFE BidWise Personal to CFE BidWise Business
CFE BidWise Personal

On About › License info, the Grow into a team with CFE BidWise Business card shows what a team costs. Only CFE BidWise Business adds team member seats.

  1. Press Switch to Business and add a team member.
  2. Check the number of users, the new price and about what is charged today.
  3. Tick I agree and confirm.
Good to knowYour key, bids and settings stay the same, and everything you entered on CFE BidWise Personal carries over.
CFE BidWise Business

Under the License table the Master user sees the Add another team member card with the team's seats and the price per user. Its button invites into a free seat, or adds a seat first.

A PC that was on CFE BidWise Personal keeps its Personal bids with the old account, read-only. Settings › Backup / restore › Bring my Personal bids in moves them into the company, one way: they become the company's.

Trial, Limited Mode and read-only
Free trial30 days, every function on 1 computer. Team invites and the company copy wait until you pay.
Limited ModeAfter the trial: the Estimate Quote and the Dashboard keep working (new, open, edit, save, PDF with a LIMITED MODE watermark). Everything else shows 🔒 until you register. Nothing is deleted.
Read-onlyA cancelled or ended subscription: open, print and export still work. New estimate, Save and editing are off.

Register any time in About › License info; everything unlocks at once.

Two computers per seat

A seat works on 2 computers (for example a desktop and a laptop), one at a time. Opening the app on the other computer offers Move it here; the first computer turns read-only and keeps any unsaved work as a recovery copy. Closing the app frees the seat right away. Remove this computer frees a slot for a new PC.

CFE BidWise Personal
Good to knowOn CFE BidWise Personal your saved .cfe files are locked to you: they open only on your own Personal license.
Free TV screens CFE BidWise Business

The Master user adds up to 2 free TV screens on About › License info › TV screens. A TV screen uses no seat, needs no sign-in and shows only the Job board and Deliveries, with no prices. See Warehouse › Running a TV board on a TV.

Team: invite estimators CFE BidWise Business
  1. The Master user opens Integrate › Team.
  2. Press + Invite estimator and type their name and email.
  3. They get an email with a 6-digit team code (valid 14 days).
  4. On their own PC they open About › License info › Join your company's team and type the code. No key to copy.

+ Add seats… and Reduce seats change the plan; added seats are charged for the days left, removed seats come off the next bill. Remove user… frees a seat.

What each person can open CFE BidWise Business

The Master user opens Integrate › Team and presses What they can open next to a teammate. Pick a role (Estimator, Project manager / Office, Accountant, Warehouse, Everything) or tick the areas one by one: Estimating, Client Info, Reports, Ordering, Warehouse, Schedule, Invoicing, Accounting (with an end date) and QuickBooks Online, plus Sees bid prices. Their PC follows the change within 2 minutes. Settings, Help and About are always there, and the Master user always has everything.

Someone without Estimating who opens a bid sees Who is responsible: the Estimator and Salesman on that bid, with Email and Call. Each person types their cell, office number and job title once in About › Account › How teammates reach me.

Move our bids into another company CFE BidWise Business

For an owner who had their own CFE BidWise Business company and now joins another company as an estimator, with their bids. It takes both Master users.

  1. The other company's Master user invites you with + Invite estimator and sends you the team code.
  2. On your PC, open Integrate › Team › Move our bids into another company… and type that code.
  3. The other Master user approves the request on their Team screen (or declines it).
  4. Press Finish the move. Every bid in your company copy comes onto your PC, your PC joins the other company, and the bids become that company's bids.
Good to knowYour old company closes: its key adds no computers and its subscription is cancelled at the end of the paid period. Remove your other estimators first; their bids move too.
View as Personal or Business

During a free trial, Try as Personal | Business on the title bar does the same for you, and About › License info shows which one you are trying.

On a free key marked Super Master, a View as switch on the title bar shows the same bids and folders the way CFE BidWise Personal or CFE BidWise Business shows them. Only the screens change (locks, Business badges, the Job Folder and backup folder rules); the license, which account the bids belong to and the company copy stay as they are. This User Guide follows the switch too.

Users on this PC

File › Account shows your profile and the users on this PC. Edit my profile, Change my password and New recovery code are here. An Admin can Reset password for a user who forgot theirs and has no recovery code.

Cancel the subscription

About › License info › Cancel subscription turns auto-renew off; you keep working until the end of the paid period, then the app opens read-only. Your estimates stay on your PCs. Turn auto-renew back on undoes it.

Company copy of bids CFE BidWise Business
Company copy and online sync

With a paid license every save is also kept, locked with your company key, in your company's own shared folder (OneDrive, Google Drive, Dropbox, Box or your office server). Bids are not kept on BidWise's server.

  1. An Admin opens Settings › Backup / restore › Company copy and online sync.
  2. Press Pick folder… and choose the shared folder. Every team PC points to the same folder.
  3. Choose Auto-sync (recommended: your other computer brings in newer bids by itself) or Sync only when I press Sync now.
Print the recovery key

The Master user prints the company recovery key once and keeps it with the company papers. It is for the day every PC is lost or the Master user leaves: on a new PC use About › License info › Recover company bids. If the printout is lost, print a new one in Settings › Backup / restore (the old one stops working).

Hand over my bids
  1. Open Integrate › Team › Hand over my bids… (or File › Share › Hand over my bids).
  2. Tick the bids, pick the teammate and press Hand over.
  3. Your teammate presses Accept on their Dashboard.

Nothing is deleted: your copies stay on your PC, read-only, and you stay as the Estimator. The Master user sees every handover and can undo it. Save for a teammate (.cfeteam) puts bids in one locked file that opens only on your team's PCs.

When an estimator leaves

Their bids stay with the company. The Master user opens Integrate › Team and uses Bring back bids… to give them to someone else. A leaving estimator cannot delete or clear the company's bids.

🛠Troubleshooting
Start-up and installing
The app does not open (nothing happens)
  1. Start it from the CFE BidWise icon on the desktop or in the Start menu.
  2. Still nothing? Download CFE-BidWise-Setup.exe again from the download page and run it. It repairs the program; your estimates and settings stay as they are.
  3. If it still does not open, email BidWise support with the newest cfe-….log from Documents\CFE Estimating\Logs, or call us.
Windows protected your PC (SmartScreen)

Press More info, then Run anyway. Windows shows this for new programs until it knows them.

The window stays blank or black

Close it and double-click Start in safe mode.bat in the app folder. It starts without the graphics card. If that works, update your graphics driver.

"WebView2 runtime not found"
  1. Download the Microsoft Edge WebView2 Runtime (Evergreen Standalone, x64) from Microsoft's website.
  2. Install it and start the app again.
Antivirus or "Controlled folder access" blocks it

Allow CFE BidWise in your antivirus (the program is in C:\Program Files\CFE Estimating). If Windows blocks the Documents folder, the app saves to its own app data folder instead; About › Open data folder shows where.

Signing in
I forgot my password
  1. On the sign-in card press Forgot password? and type your username.
  2. Type your recovery code, or the code emailed to you, then a new password.
  3. No recovery code? Use your license key, or ask CFE BidWise support for a one-time code (needs internet, works for 30 minutes).
  4. An Admin on the same PC can also use File › Account › Reset password for you.
The verification code does not arrive

Check the spam or junk folder, wait a minute and press Send a new code. Make sure the email address is typed right. Office filters sometimes hold the first email from a new sender.

"This account is not verified yet"

Sign in and type the 6-digit code from the email, or press Send a new code.

My account is locked

After several wrong passwords the account waits a short time. Wait and try again, or use Forgot password?.

License and computers
"Your seat is in use on another computer"

Your seat works on one computer at a time. Press Move it here to work on this PC; the other one turns read-only and keeps unsaved work as a recovery copy (File › Open › AutoSave). Or close the app on the other computer first.

The app turned read-only or Limited Mode

Open About › License info and press ⟳ Refresh license while connected to the internet. If the trial ended, register; if the subscription ended, renew. Your estimates are never deleted.

"needs to confirm your license online"

Connect to the internet and press Refresh license. The app checks the license from time to time and works offline in between.

New PC or a PC was replaced
  1. On the old PC (if it still works): About › License info › Remove this computer.
  2. Install the app on the new PC and sign in.
  3. Enter your license key or team code in About › License info.
  4. Bring your data: restore from your backup (Settings › Save › Restore from backup…), or turn on Desktop and laptop sync.
Estimating
A total looks wrong
  1. Press Home › Recalc.
  2. Press Home › Checks and fix what it lists (missing units, prices or GP %).
  3. Check Markup / Margin: the same GP % gives a lower price in Markup.
  4. Check View › Net Area: with it on, labor uses the Net column.
  5. Check Tax Exempt, Performance Bond and the tax rates in the header and Settings.
I cannot type in a cell

Gray cells are formulas and are locked on purpose. Type in the white and yellow cells. The SAMPLE is read-only: press Copy to new estimate. In Limited Mode or read-only mode, only some sheets can be edited.

A proposal does not change with the estimate

It was edited by hand, so it is unlinked. Open it and press ↺ Reset to Estimate to link it again (your hand edits are replaced).

The Change Order total is not in the bid

A Change Order joins Total with COs only when it has a line or an amount. Check its lines, and that it was not deleted from the left menu.

I lost my changes
  1. File › Info › Restore a version lists every saved version.
  2. Unsaved work after a crash or a seat move is kept as a recovery copy: File › Open › AutoSave.
  3. An Admin can restore one estimate from a backup: Settings › Save › Restore from backup… › One estimate.
"This screen could not open"

BidWise shows this message and goes back to the Dashboard instead of leaving a blank or half-drawn screen. Take a screenshot of the message and send it to CFE BidWise support (or press Help › Send log). Your saved work is not affected.

Printing and email
The printout is cut off or too small

In the preview switch Portrait / Landscape. Turn on View › Page Break to see where pages end. Print to PDF first to check it.

The logo does not print

Add it in Settings › Company info (JPG or BMP, max 500 KB) and press Save settings.

Email PDF does not send
  1. Open Settings › Email and press Send a test email to me.
  2. Outlook, Microsoft 365 and Hotmail: use Sign in with Microsoft; typed passwords no longer work for these.
  3. Gmail, Yahoo, AOL and iCloud with server settings need an app password from the account's security settings, and port 587.
  4. Meanwhile use Open in my email program: it opens Outlook with the PDF attached.
Backup and sync
The backup did not reach the cloud

For a synced folder: check that the cloud program (OneDrive, Google Drive…) is running and signed in, and that the folder shows in File Explorer. For a Google Drive link: press Sign in with Google again; the signed-in account needs edit access to the folder.

An estimate is not on my other computer

Check these, in order:

  1. Both computers have sync on with the same cloud folder and you are signed in to BidWise with the same username on both.
  2. The cloud app is running and signed in with the same account on both, and says it is up to date (not paused).
  3. The CFE Estimating Sync folder is kept on each computer (OneDrive: Always keep on this device; Google Drive: Available offline; Dropbox: Make available offline).
  4. Press Integrate › Sync now. The estimate comes in within 2 minutes of being saved on the other computer.

Step by step with pictures: Files, printing and email › Desktop and laptop sync.

Get help from BidWise
Remote Support
  1. Call BidWise at (916) 802-5127.
  2. Press Help › Remote Support. The app saves your work.
  3. Windows Quick Assist opens (or its free download page if it is not installed).
  4. Type the code the BidWise technician reads to you and allow screen sharing.
Good to knowBidWise can only see your screen while you allow it. Close Quick Assist to end the session.
Send a log or a message

Help › Send log opens the Logs folder; attach the newest cfe-….log to an email to support (it holds no estimate data). About › Contact CFE BidWise sends a message with an optional log or .cfe file.

Contact details
Phone(916) 802-5127
Emailestimator@commercialflooringestimating.com
HoursMonday to Friday, 8 AM to 5 PM Pacific
Websitewww.commercialflooringestimating.com
DEV mode (CFE BidWise support only)

DEV mode is for CFE BidWise support. With the CFE BidWise support password it unlocks the gray formula cells for 2 minutes, so support can check or change a formula on one estimate. You do not need it for normal work.

❓Common questions
What is the difference between CFE BidWise Personal and CFE BidWise Business?

See Getting started › CFE BidWise Personal and CFE BidWise Business. In short: CFE BidWise Personal is 1 user with the simpler version of each tab; CFE BidWise Business is your company's team with the advanced parts. Switching keeps everything you entered.

Where did the Material List go?

It moved from the left menu to Ordering › Material List. The Work Order for Warehouse is on Warehouse › Work order.

Does BidWise read my email inbox?

No. The Job Folder and From bid invite read only the one email you drag, pick or paste. BidWise never opens your mailbox.

Can I use it without internet?

Yes. Estimating, saving and printing work offline. Internet is needed for sign-up codes, the license check from time to time, email and cloud backup.

Can two people use the same estimate?

Each estimator works in their own copy of the app. To share a bid, email the .cfe data file (File › Share), or on CFE BidWise Business hand it over to a teammate. One seat works on one computer at a time.

How do I bid the same job to several GCs?

Finish the estimate, then on the Dashboard press ⧉ Duplicate and change the Company. Each copy gets its own bid number and status.

How do I change the next bid number?

Settings › Defaults › Next bid number (digits only), then Save settings.

Square meters for Europe or Canada?

Pick M2 in the Units column, or set it as the default unit in Settings › Defaults. VAT there changes the tax label.

Does the app read blueprints or make takeoffs?

No. It reads the Callidus, Measure Square, RFMS Measure or FloorRight takeoff PDF you export, by plain code on your PC. Need takeoffs done for you? See Help › Estimating Service.

Why does my phone camera not show what is on a warehouse label?

On purpose. The QR code on BidWise labels only works in the BidWise Field app (Warehouse). Any other phone opens a BidWise page that asks for the BidWise app and permission, so strangers never see your stock, jobs or customers. See Warehouse › Labels for stock and jobs.

Where are my estimates if I uninstall?

In your data folder (Documents\CFE Estimating), not in the app folder. Deleting the app folder does not delete them.

🌐Online User Guide

The same guide on the BidWise website, to read in a browser, print, or send to a new estimator.

Open the online User Guide ↗

https://www.commercialflooringestimating.com/cfe-app/userguide.html